Compare time tracking and project management software for planning and delivery workflows, with options like Asana and Monday.com and key tradeoffs.
How we ranked these tools
Vendors set the topic, but our editors set the inclusion criteria and the evaluation framework before research starts.
AI search agents find sources, extract figures with provenance, and aggregate written reviews. They also transcribe video reviews and podcasts.
Framework: Features 40% · Ease 30% · Value 30%
Gitnux may earn a commission through links on this page. This does not influence our reviews. Editorial policy
Basecamp is the best choice for SMB teams that want straightforward project coordination with time logging thanks to recurring to-dos that keep routine work aligned, while Smartsheet fits spreadsheet-first groups since timesheet submission and approvals run as structured sheet processes.
Editor’s top 3 picks
Three quick recommendations before you dive into the full comparison below — each one leads on a different dimension.
Basecamp
Automatic task and project content organization via recurring to-dos that keep routine work aligned across projects.
Best for: Fits when teams want time logging plus simple project coordination without complex scheduling governance.
Asana
Editor pickTask-level time tracking stays attached to Asana’s Work Graph fields and approval logic, so reported effort follows the work context.
Best for: Fits when teams need task-linked time tracking with automation for approvals and project reporting in one workflow.
Monday.com
Editor pickItem-linked timesheets with an approval hierarchy lets teams route time entries through review before reporting.
Best for: Fits when teams want time entries inside a shared project timeline with approvals.
Comparison Table
Basecamp
SMBProject management and team communication platform with time tracking via third-party integrations.
Automatic task and project content organization via recurring to-dos that keep routine work aligned across projects.
Basecamp’s core model centers on project workspaces that combine tasks, messages, and documents so teams can keep decisions near the work. The time tracking workflow supports adding time entries to projects and organizing work by responsible users and project context. Reporting covers recorded time and project activity so managers can review what was logged and where it was allocated. Integration coverage exists mainly through external connections and API access for syncing work artifacts and automating routine updates.
A tradeoff is that Basecamp is less suited to advanced scheduling and analytics workflows such as capacity forecast with granular resource calendars. It fits situations where teams need a single place to coordinate tasks and discussions while recording time against projects for internal tracking and client-facing rollups. For heavy governance needs like complex approval hierarchies, Basecamp often requires tighter process discipline and simpler workflow design.
- +Project-centered workspaces keep discussions, tasks, and files together
- +Time entries map cleanly to projects for straightforward internal reporting
- +Board views support quick status scans without complex setup
- +API enables automation of tasks and project content updates
- –Limited automation for automatic time capture beyond manual entry patterns
- –Advanced schedule analytics like earned value management are not a focus
- –Timesheet approvals are not designed as a deep multi-step hierarchy
- –Capacity planning needs extra process work compared with specialized tools
Agency project managers
Log billable work by project tasks
Faster internal status reviews
Small operations teams
Run recurring checklists with time entries
Consistent execution cadence
Show 2 more scenarios
Distributed consulting teams
Coordinate work via posts and tasks
Lower meeting overhead
Use shared project threads plus to-dos while collecting time for progress reporting across locations.
Finance and billing analysts
Review recorded time by project
Cleaner audit trails
Use exported time reports to reconcile logged work to project delivery lines for invoicing support.
Best for: Fits when teams want time logging plus simple project coordination without complex scheduling governance.
Asana
SMBWork management platform with time tracking via integrations and native time tracking features.
Task-level time tracking stays attached to Asana’s Work Graph fields and approval logic, so reported effort follows the work context.
Asana combines project management with time tracking so work can move from task creation to reported effort in one system. The Work Graph model links tasks, owners, due dates, and custom fields so time entries can be tied to specific deliverables.
Built-in reporting and workflow automation cover timesheet-style approval flows, recurring task automation, and project-level visibility through dashboards. Asana is best when teams want a single workflow for project execution and the time data needed for operational reporting.
- +Project boards and custom fields make time reporting attributable to specific deliverables
- +Automation rules support approval-style flows and recurring work without custom code
- +Integrations connect time and project records to widely used team tools
- +Reporting surfaces effort at the task and project level for operational review
- –Time capture is less granular than dedicated timesheet products for complex billing structures
- –Admin controls for audit and governance require more planning as workspaces scale
- –Resource planning depth like resource leveling is limited compared with scheduling-first systems
- –Dependency mapping and schedule modeling depend more on manual setup than advanced critical path features
Product and software teams
Coordinate sprint tasks and feature progress
Clear ownership by sprint cycle
Innovation and program teams
Manage stage-gate initiative delivery status
Shared initiative status view
Show 2 more scenarios
Project managers and delivery teams
Plan schedules with dependencies and milestones
Schedule connects planning to progress
Teams map task dates, dependencies, and milestones so tracked work progress stays connected to the plan.
Implementation and operations teams
Coordinate delivery responsibilities across teams
Common delivery responsibilities view
Teams run implementation projects with tasks and milestones while keeping cross-team dependencies in a shared view.
Best for: Fits when teams need task-linked time tracking with automation for approvals and project reporting in one workflow.
Monday.com
SMBWork OS offering project management with a native time tracking column widget.
Item-linked timesheets with an approval hierarchy lets teams route time entries through review before reporting.
Monday.com records work in project timelines and task boards, then connects that work to time tracking via time entries linked to items. It supports timesheet-style workflows with approvals, plus recurring task automation that can trigger time capture and status updates on schedule.
For project operations, it offers Gantt chart planning, dependency mapping, and milestone tracking tied to a shared project structure. Reporting can roll up tracked effort into project budgets and utilization-style views, with data export for offline analysis.
- +Time entries tie to tasks so reporting stays item-level, not freeform
- +Recurring task automation supports repeat schedules for work and time capture
- +Approval hierarchy enables structured review of time entries
- +Gantt chart and milestone tracking stay connected to board items
- –Time capture workflows require careful setup of item links and views
- –Capacity planning views are less specialized than dedicated resource planning tools
- –Dependency mapping can become cluttered in large programs with many relationships
- –Automation complexity grows quickly when multiple teams need different rules
Project teams and requestors
Turn intake inputs into delivery tasks
Request scope maps to delivery
Project managers and PMOs
Roll up milestone and status across projects
Portfolio view of current execution
Show 2 more scenarios
Operations process owners
Represent recurring workflows as staged boards
More consistent stage progression
Teams model intake, review, approval, and delivery as repeatable stages to standardize how work moves.
Change managers and program teams
Track dependencies and adoption activities
Structured change execution reporting
Teams record initiative impacts, stakeholders, and dependency signals across boards to manage change execution and reporting.
Best for: Fits when teams want time entries inside a shared project timeline with approvals.
Smartsheet
enterpriseSpreadsheet-based work management with time tracking via premium add-ons.
Timesheet submission and approval workflow runs as structured sheet processes with controlled edits.
Smartsheet organizes planning and execution around sheets that can act like a data layer for projects. Work can be modeled with views such as Gantt chart and Kanban board, then summarized into reports for schedule and effort visibility. Automation can run recurring task automation for updates and reminders, and it can route work through an approval hierarchy for controlled changes.
- +Spreadsheet-native design speeds modeling for non-technical operations teams
- +Approvals tie timesheet entries to controlled workflow outcomes
- +Gantt and Kanban views update from the same underlying sheet structure
- +Reports and dashboards centralize project status across multiple sheets
- –Complex scheduling logic can require custom sheet relationships
- –Some advanced project analytics depend on how data is structured
- –Cross-project governance needs disciplined workspace and permission design
- –Automation depth can feel limited for event-driven workflow branching
Operations and program management teams
Track delivery work with approvals
Fewer mismatches between work and time
Project coordinators
Maintain schedule views from one sheet
Consistent schedule reporting
Show 2 more scenarios
Resource managers
Review utilization and workload trends
Better staffing decisions
Managers summarize approved time entries to assess capacity forecast and staffing balance.
Finance and governance teams
Audit work and time records
Clear accountability for changes
Governance teams review the project audit trail for who changed schedules and time entries.
Best for: Fits when spreadsheet-based teams need structured project tracking and approval workflows.
Harvest
SMBTime tracking and invoicing software with project budget management.
Timesheet approvals with auditable change history that ties tracked time to client and project records.
Harvest is a practical choice when timesheets drive billing and project reporting, because it links tracked time to clients and projects and supports timesheet approval workflows. It also provides utilization reporting such as billable hours and time summaries by person and project, which helps surface variances without requiring a separate analytics stack. The automation surface includes reminders for timesheet completion and rules around rounding and entry behavior that reduce reconciliation work.
- +Approval hierarchy connects timesheets to client and project reporting
- +Rounding rules and time entry controls reduce downstream reconciliation
- +API and webhooks support time and project data synchronization
- +Role-based user access supports governance for tracked records
- –Project planning features like Gantt and dependencies are limited
- –Capacity planning and resource leveling require outside processes
Professional services teams
Client timesheets with approvals
Faster billing with fewer corrections
Project operations teams
Utilization and project cost snapshots
Improved margin awareness
Show 2 more scenarios
Remote consulting squads
Automatic time capture and reminders
More on-time timesheets
Harvest keeps distributed teams on track with timer-based capture and timesheet completion reminders.
RevOps and systems teams
API-driven time data sync
Less manual spreadsheet work
Harvest provides an API surface for syncing time, project, and client data into other systems.
Best for: Fits when teams need accurate timesheets tied to projects and client reporting without heavy scheduling.
Toggl Track
SMBTime tracking tool with project management and team workload views.
Automatic time capture using Toggl Track timers plus configurable categorization for clean, report-ready entries.
Toggl Track is a time tracking and lightweight project management tool focused on fast capture, reporting, and cross-tool workflows. It offers timer-based and manual logging with project and client categorization, plus timesheet-style views for reviewing work.
- +Fast timer capture with manual adjustments for exceptions
- +Granular reports tied to projects, clients, and tags for analysis
- +CSV export for timesheets and audit workflows
- +Integrations for pushing time data into common work systems
- –Project planning tools are lighter than Jira Software or full-suite PM apps
- –Approval hierarchy and timesheet approval workflow coverage can require configuration discipline
- –Capacity planning and budget analytics are limited compared with dedicated PM suites
- –Automation and API workflows depend on external integration patterns
Project managers and delivery teams
Break down effort by initiatives and tasks
Effort breakdowns for review
Project leads and service businesses
Use time history to improve estimates
More accurate project estimates
Show 2 more scenarios
Managers and operations teams
Track PTO with notes and categorization
Traceable PTO records and summaries
Teams categorize leave-related entries with notes and tags and generate summaries by person and period.
Team leads and operations managers
Analyze utilization by person and client
Allocation and utilization visibility
Managers review time by person, client, project, and date to identify allocation and utilization patterns.
Best for: Fits when teams need dependable time capture, reporting, and basic project structure with strong export and integration paths.
TimeCamp
SMBTime tracking software with project budgeting and automatic time mapping.
Project profitability analysis that connects tracked time and budgets to margin-focused reporting.
TimeCamp captures time through manual timers, browser tracking, and integrations that associate work with projects and tasks. The project management side centers on managing time-based deliverables, scheduling work on a Gantt chart, and maintaining a timesheet approval workflow with approval hierarchy.
- +Automatic time capture via browser and tracked activities tied to projects
- +Timesheet approval workflow with approval hierarchy for structured sign-off
- +Gantt chart support for planning and aligning time with timelines
- +Detailed profitability reporting connects effort to project budget burn
- –Project setup needs careful configuration of projects, tasks, and tracking rules
- –Advanced automation requires more admin discipline than Jira-style workflows
- –Bulk edits and historical adjustments can feel heavy when governance is strict
- –Capacity planning outputs depend on clean categorization of time entries
Distributed teams and field staff
Log desk and on-site work time
Unified time records across locations
Service teams and project managers
Record billable time for client delivery
Billable totals for review
Show 2 more scenarios
Architecture and project firms
Assign logs to project phases for review
Traceable time by work structure
Teams attach work logs to tasks or project stages to support structured project reviews and handoffs.
Project managers and business owners
Compare tracked hours to budget use
Visibility into budget and effort
Teams review tracked hours alongside estimates and budgets to see how effort aligns with planned spending.
Best for: Fits when teams need time capture tied to project planning, plus approval and audit controls.
Wrike
enterpriseProject management software with native time tracking and resource allocation.
Wrike’s automation builder can drive recurring workflows and approval routing based on task updates and fields.
Wrike pairs project planning with work execution in one system, with task-level reporting that keeps time tracking connected to delivery. Time capture supports manual entry, project-based tracking, and work log reporting, which helps teams reconcile hours against activity in the same workspace.
- +Tight linkage between tasks, statuses, and time logs improves delivery-level reporting.
- +Workflow automation supports recurring request handling and approval routing.
- +Reporting covers project execution views and work log summaries for stakeholders.
- +Project templates speed setup of repeatable planning structures.
- –Approval hierarchy requires careful configuration to avoid inconsistent reviewer paths.
- –Deep configuration choices can increase onboarding time for new workspace admins.
- –CSV timesheet export is available, but advanced extraction often needs reporting work.
- –Cross-project resource views take more configuration than single-project tracking.
Project controls and delivery managers
Spot schedule drift from tasks to milestones
Earlier delay and milestone risk signals
PMOs and portfolio managers
Unify project health and capacity across portfolio
Consolidated project health and capacity
Show 2 more scenarios
Distributed project teams
Attach discussions to relevant work items
Fewer disconnected communication threads
Teams keep comments, mentions, files, and document activity attached to tasks and projects to reduce fragmented status threads.
Marketing operations and campaign teams
Run campaign briefs and approvals in one workspace
Controlled campaign execution and delivery
Teams manage campaign calendars, creative tasks, approvals, and channel launches while tracking delivery within shared projects.
Best for: Fits when mid-size teams want one system for project work and time logs with configurable workflows.
Clockify
SMBFree time tracker with project and task organization features.
Project audit trail built from tracked time entries, showing who logged, edited, and approved work by task.
Clockify combines time tracking, timesheets, and project assignment into one workflow for teams that need consistent capture and reporting. Automatic time capture and manual adjustments support day-to-day logging, while billable reporting and CSV export help connect logged work to project reporting needs.
- +Automatic time capture reduces missed intervals compared with manual timers
- +CSV export supports straightforward spreadsheet-based reporting
- +Timesheet approval workflow fits recurring reviews and audit trail needs
- +Task-level time attribution keeps reporting aligned to work items
- –Project management depth is thinner than Jira Software for complex delivery tracking
- –Reporting granularity depends heavily on correct project and task setup
- –Advanced resource planning features require careful manual interpretation
- –Dependency mapping and critical path method are not first-class modules
Professional services teams
Track hours by project and client
Project hours and client allocations
Payroll and accounting teams
Reconcile approved time with financial workflows
Approved time for reconciliation
Show 2 more scenarios
SMB operations and hourly employers
Centralize clock-in and clock-out records
Centralized attendance and clock-ins
Employees clock in and out through web, mobile, or kiosk-style workflows while managers review centralized attendance reports.
Project leaders and resource managers
Monitor burn and utilization against plans
Detect burn and utilization trends
Managers compare logged hours with project plans, budgets, or utilization targets to detect allocation patterns.
Best for: Fits when teams need accurate time capture with timesheet approvals and project-level summaries.
Hubstaff Tasks
SMBAgile project management with time tracking for engineering teams.
Task-linked time tracking pairs each time entry with the specific assignment for cleaner review.
Hubstaff Tasks combines task management with time tracking in a single workflow, so teams can move from assignment to logged work without switching tools. It supports time entries tied to tasks, team work scheduling, and reporting for project and individual views.
- +Time entries connect directly to tasks for audit trail continuity
- +Activity status tracking helps managers validate work starts and stops
- +Project reports consolidate effort by team member and project
- +Task templates support repeatable delivery workflows
- –Advanced project planning views are less detailed than dedicated PM suites
- –External integrations need careful setup to match existing approval flows
- –Granular permission controls are limited compared to enterprise governance tools
- –Time reporting can require more configuration than simple dashboards
Creative services teams
Log billable hours per deliverable task
Faster timesheet approvals
Agencies and project managers
Track effort across multiple active projects
Lower reporting overhead
Show 2 more scenarios
Small operations teams
Run recurring work with templates
More consistent execution
Repeatable task setup supports steady operational rhythms and consistent time logging.
Remote teams
Validate activity during work windows
Fewer timesheet disputes
Activity status signals help managers resolve missing work during review cycles.
Best for: Fits when teams need task execution and time logging together for routine project delivery cycles.
Conclusion
After evaluating 10 time tracking and project management software, Basecamp stands out as our overall top pick — it scored highest across our combined criteria of features, ease of use, and value, which is why it sits at #1 in the rankings above.
Use the comparison table and detailed reviews above to validate the fit against your own requirements before committing to a tool.
Frequently Asked Questions About Time Tracking and Project Management Software
How do Asana and Jira Software handle linking time entries to the work item without losing context?
Which tools support timesheet approval workflow controls and auditable changes for recorded time?
When does automatic time capture create gaps, and how do Toggl Track and Clockify address manual corrections?
What breaks if a team needs Gantt chart planning and dependency mapping alongside time tracking?
How do Microsoft Project for the web and Monday.com represent scheduling baselines and effort tracking for delivery reporting?
Which tool supports data export for offline analysis and downstream timesheet reporting?
How do admin controls differ between Harvest and Hubstaff for distributed teams and permission governance?
When migrating existing timesheets, what data model mapping work is usually required in Asana versus TimeCamp?
What security expectation changes when comparing Wrike and Basecamp for SSO and audit trail needs?
Tools reviewed
Primary sources checked during evaluation.
Referenced in the comparison table and product reviews above.
How to Choose the Right Time Tracking and Project Management Software
We see the biggest differences in time tracking and project management software where integration depth meets admin and governance controls. In practice, the workflow around timesheets, approvals, and reporting depends on how well the tool automates data flow and enforces who can change what—during execution and at close.
Time capture accuracy
Why it matters
Time capture accuracy determines whether the system reflects what happened on the workday, not just what someone remembered later. If time is captured or inferred inconsistently, downstream reports and billing support become harder to defend.
How to check
Ask the vendor to show at least two ways to enter time (manual and an automated option) and then review how the entries land on a project and task. Try a quick test: record a short interval under one task, then confirm the resulting timestamps and categories on the timesheet view.
Timesheet approval workflow
Why it matters
A clear timesheet approval workflow reduces rework and makes project status updates less dependent on email chasing. It also sets expectations for who reviews corrections before work is considered official.
How to check
On a demo, request a configuration where a submitter needs review by a manager, and then a final step that locks after approval. Submit sample time, change it post-approval, and ask what happens to audit history and approval status.
Project reporting from time
Why it matters
Reporting that reflects the time you actually logged is what turns tracking into project management. This matters most when you compare planned work versus actuals for ongoing decisions and close-out.
How to check
Have them show a report that breaks down time by project and task, including billed vs non-billed fields if available. Then export a small dataset (or recreate it) and confirm the numbers match what you entered on the timesheet.
Task and project data model
Why it matters
A task and project data model affects how reliably the tool maps work into categories you already use. If the structure is rigid, you’ll spend time forcing names and fields instead of tracking work.
How to check
Ask how projects, tasks, and time entries relate, and whether you can add required fields for your internal workflow. Create two projects with multiple tasks, then show how a single time entry chooses the correct task and how missing fields are handled.
Automation and API surface
Why it matters
Automation and API surface is what keeps your time tracking current when other systems change. If the tool can’t automate with a documented API or hooks, admins end up running brittle manual transfers.
How to check
Ask for a walkthrough of the available API endpoints or automation triggers used for time entry, approvals, and status changes. In the demo, look for a sandbox or testing approach, then ask the vendor to show an example workflow that pushes and pulls time data.
RBAC and audit log visibility
Why it matters
RBAC and audit log visibility help you prevent accidental edits and explain discrepancies when projects don’t reconcile. Governance is especially important when multiple teams contribute time and corrections.
How to check
Request a demo scenario with three roles: submitter, approver, and read-only viewer. Then change a time entry as each role and confirm the audit log records who changed what, and whether permissions block specific edits.
Red flags
- Edits after approval are allowed without clear locking and audit trails.
- Reports don’t match the timesheet totals when you export or filter by project.
- Roles can’t restrict who can change time, approvals, or task assignments.
Fit by situation
- If you run frequent approvals and last-minute fixes, prioritize timesheet approval workflow.
- If your team relies on other systems for time entry or status updates, prioritize automation and API surface.
- If multiple teams contribute time and disputes happen, prioritize RBAC and audit log visibility.
Funding and competing interests
This study was co-funded by several of the vendors assessed in it. No single vendor funded it. Funders could propose the market studied.
They had no role in selecting vendors, setting or weighting criteria, analysing data or drawing conclusions, and they received the same factual-accuracy check as every other vendor assessed.
Market definition, inclusion rules and criteria weights were fixed by an editor before research began and did not change afterwards. Editorial process →
Keep exploring
Comparing two specific tools?
Software Alternatives
See head-to-head software comparisons with feature breakdowns, pricing, and our recommendation for each use case.
Explore software alternatives→In this category
Supply Chain In Industry alternatives
See side-by-side comparisons of supply chain in industry tools and pick the right one for your stack.
Compare supply chain in industry tools→