Top 10 Best Project Gantt Chart Software of 2026

GITNUXSOFTWARE REVIEW

Business Process Outsourcing

Top 10 Best Project Gantt Chart Software of 2026

A market roundup comparing project gantt chart software tools for planning timelines and managing tasks, with practical tradeoffs for teams using TeamGantt.

20 min readUpdated Editorially scoped research
How we ranked these tools
01Editorial Scope

Vendors set the topic, but our editors set the inclusion criteria and the evaluation framework before research starts.

02Source Research

AI search agents find sources, extract figures with provenance, and aggregate written reviews. They also transcribe video reviews and podcasts.

Read our full methodology →

Framework: Features 40% · Ease 30% · Value 30%

Gitnux may earn a commission through links on this page. This does not influence our reviews. Editorial policy

Project gantt chart software tools map tasks into time-based schedules with dependency links, then track progress against the plan so teams can manage complex timelines without spreadsheet drift. This comparison helps planners weigh tradeoffs across collaborative editing, resource and workload views, and integration or API options needed for automation and governance.

ProjectManager is the best pick for planning teams that want Gantt timelines plus execution reporting in one place because its baseline snapshots make schedule slippage visible against the planned state, while Celoxis fits mid-size portfolios needing dependency-driven Gantt with variance views across nested work.

Editor’s top 3 picks

Three quick recommendations before you dive into the full comparison below — each one leads on a different dimension.

Editor pick
1

ProjectManager

Baselines in the Gantt timeline provide schedule slippage visibility against the planned snapshot.

Best for: Fits when planning teams need Gantt timelines plus execution reporting from one task record.

2

Celoxis

Editor pick

Portfolio baselining snapshots with variance views tie schedule drift to progress and staffing across nested subprojects.

Best for: Fits when mid-size portfolios need dependency-driven Gantt plus baselining and governance controls.

3

TeamGantt

Editor pick

Rolling updates from task status into the Gantt view lets stakeholders track percent-complete changes without manual chart rebuilding.

Best for: Fits when planning teams need dependency-based Gantt updates, baselines, and nested projects without heavy admin overhead.

Comparison Table

1
ProjectManagerBest overall
SMB
9.0/10
Overall
2
enterprise
8.9/10
Overall
3
8.6/10
Overall
4
8.5/10
Overall
5
8.2/10
Overall
6
vertical specialist
7.7/10
Overall
7
7.5/10
Overall
8
7.2/10
Overall
9
6.9/10
Overall
10
6.5/10
Overall
#1

ProjectManager

SMB

Online project management tool built around Gantt chart scheduling, timesheets, and workload tracking.

9.0/10
Overall
Features9.0/10
Ease of Use9.0/10
Value9.0/10
Standout feature

Baselines in the Gantt timeline provide schedule slippage visibility against the planned snapshot.

ProjectManager’s Gantt view can represent work breakdown structures with subprojects, milestone tracking, and dependency lines that update as tasks move. Dependency linking supports predecessor and successor relationships, and task progress rolls up to higher-level work items. Baselines enable baseline comparison so schedule slippage is visible when actual progress diverges from the planned path.

A practical tradeoff appears when teams expect deep scheduling controls like constraint-based scheduling or advanced resource leveling mechanics, since the scheduling model is simpler than specialized planning engines. ProjectManager fits when planning teams need Gantt timelines plus execution tracking and recurring progress status from the same task records.

Pros
  • +Gantt integrates task progress and baseline comparison in one timeline
  • +Dependency linking updates schedule dates without manual rework
  • +Milestone tracking and subproject nesting support structured rollups
  • +Status reporting can draw from the same Gantt task data
Cons
  • –Scheduling depth is limited versus constraint-based planning tools
  • –Resource smoothing and detailed leveling controls are not the focus
  • –Advanced bar styling overrides are limited for complex visual standards
  • –Large plans can feel heavier when many tasks and dependencies are dense
Use scenarios
  • Program management teams

    Track multi-workstream milestones and status

    Faster schedule variance discussions

  • PMO planners

    Standardize dependency-driven project plans

    Fewer manual timeline updates

Show 2 more scenarios
  • Client-facing delivery teams

    Share interactive timeline progress

    More consistent project reporting

    Percent-complete tracking and Gantt status views support stakeholder updates without exporting spreadsheets.

  • Operations planning teams

    Roll up work into structured WBS

    Clear ownership and visibility

    Work breakdown structures map to nested tasks so progress and dates roll up cleanly.

Best for: Fits when planning teams need Gantt timelines plus execution reporting from one task record.

#2

Celoxis

enterprise

PPM software with interactive Gantt charts, critical path, and portfolio dashboards.

8.9/10
Overall
Features8.9/10
Ease of Use8.9/10
Value8.9/10
Standout feature

Portfolio baselining snapshots with variance views tie schedule drift to progress and staffing across nested subprojects.

Celoxis supports dependency-driven schedule rendering with predecessor links and progress-based updates, which keeps the Gantt view aligned with task status changes. Baselining snapshots let teams compare current dates against planned baselines, and schedule variance reporting clarifies where slippage accumulates. Resource assignment connects staffing to tasks so managers can spot overallocation patterns during planning cycles.

A key tradeoff is that Celoxis favors configuration depth over quick setup, so onboarding requires model alignment for dependencies, task fields, and resource usage rules. Celoxis fits teams that run rolling wave planning across many projects and need consistent reporting that ties milestones to staffing and schedule drift.

Pros
  • +Baselining snapshots enable direct schedule variance reporting in the same planning workspace
  • +Dependency linking drives Gantt recalculation when task progress or dates change
  • +Subproject nesting keeps portfolio-level timelines readable without flattening work
  • +Role-based access and audit trails support governance across multiple projects
Cons
  • –Advanced scheduling configuration takes time to align fields, rules, and templates
  • –Custom views for complex plans can require repeated layout tuning
Use scenarios
  • Program management teams

    Track milestones across nested subprojects

    Milestones stay traceable to task progress

  • PMOs

    Compare baselines to current schedules

    Slippage patterns become reportable

Show 1 more scenario
  • Resource planning teams

    Plan staffing alongside task calendars

    Overallocation issues surface earlier

    Assignments connect work to resources so schedule and workload changes reflect in planning views.

Best for: Fits when mid-size portfolios need dependency-driven Gantt plus baselining and governance controls.

#3

TeamGantt

SMB

Collaborative Gantt chart builder with drag-and-drop scheduling and dependency tracking.

8.6/10
Overall
Features8.6/10
Ease of Use8.6/10
Value8.6/10
Standout feature

Rolling updates from task status into the Gantt view lets stakeholders track percent-complete changes without manual chart rebuilding.

TeamGantt turns Gantt planning into a task-and-milestone workflow with interactive bars, dependency links, and baseline views for schedule comparison. Work breakdown structure support comes through nested projects and subproject inclusion for portfolio-style planning.

Built-in automation handles status capture and update propagation across tasks without exporting to a separate system. Admin and collaboration controls focus on role-based access for project members and controlled sharing at the workspace level.

Pros
  • +Interactive dependency linking with clear predecessor and successor mapping
  • +Baseline snapshots enable schedule comparison without switching tools
  • +Status updates can be collected and rolled into task percent-complete
  • +Subproject nesting supports work breakdown structure planning
Cons
  • –Advanced schedule analytics like earned value management need workarounds
  • –API access exists but complex integrations often require custom middleware
  • –Resource leveling and smoothing alerts are limited versus scheduling specialists
  • –Large plans can feel slower when many tasks render with custom bar styles
Use scenarios
  • Operations teams

    Reuse templates for repeated projects

    Less setup for recurring work

  • Construction and field operations

    Plan phased work with milestones

    Visual schedule for sequential delivery

Show 2 more scenarios
  • Project controls managers

    Compare current schedule to baseline

    Clear planned versus current gaps

    Project managers compare current dates with baseline plans to spot schedule drift during ongoing execution.

  • Plant and operations managers

    Coordinate shared operational timelines

    Shared schedule with clear ownership

    Operations teams use shared Gantt timelines to align planned activities across owners and planned dates.

Best for: Fits when planning teams need dependency-based Gantt updates, baselines, and nested projects without heavy admin overhead.

#4

Monday.com

SMB

Work operating system with a Gantt timeline view for project planning and dependency mapping.

8.5/10
Overall
Features8.5/10
Ease of Use8.5/10
Value8.5/10
Standout feature

Automations can update dependent tasks and key date fields when plan fields change across the same board.

Monday.com is a work management suite that can map projects onto a Gantt-style timeline for planning teams that already standardize execution in boards. The timeline view links work items to dependencies and dates while keeping tasks inside a structured board data model.

Pros
  • +Board-first data model keeps task fields consistent across views
  • +Dependency and date changes can drive updates via automation rules
  • +Interactive timeline rendering supports quick plan review and edits
  • +Granular permissions support team-level control over project visibility
Cons
  • –Critical path analysis and float calculation are not built for Gantt planning math
  • –Complex subproject nesting needs careful board structure to avoid confusion
  • –Resource leveling and overallocation alerts require non-native workflow design
  • –Gantt export formats are limited compared with Gantt-focused tools
Use scenarios
  • Service teams and requestors

    Intake requirements into timed project plan

    Connected path from scope to delivery

  • Portfolio leaders and PMOs

    Roll up milestones across projects

    Cross-project timeline visibility

Show 2 more scenarios
  • Operations process owners

    Track staged recurring business work

    Consistent movement through stages

    Teams represent recurring processes like intake, review, approval, and delivery as stage-based workflows aligned to dates.

  • Distributed team coordinators

    Share timelines, ownership, and approvals

    Shared status without scattered updates

    Distributed teams share permissioned boards and dashboards that connect task ownership, timelines, approvals, and follow-ups.

Best for: Fits when teams manage projects as board records and want timeline visualization with automation-driven status updates.

#5

Asana

SMB

Project management platform offering a timeline view that renders tasks as Gantt charts with dependencies.

8.2/10
Overall
Features8.2/10
Ease of Use8.3/10
Value8.1/10
Standout feature

Automation rules can propagate schedule-relevant changes from task status to timeline dates.

Asana timeline views map tasks to bars and let teams connect work with predecessor links, which is the core interaction for plan sequencing. Task fields such as assignees, owners, and custom fields drive how work appears in the timeline, which keeps the schedule grounded in operational data rather than a separate spreadsheet model. The integration surface includes an API for syncing tasks and dates, plus automation to trigger updates when statuses change, comments are added, or conditions match.

Pros
  • +Timeline bars are backed by task records with shared fields
  • +Dependency linking connects plan ordering to execution workflow
  • +Automation rules update dates and statuses based on triggers
  • +API supports syncing timeline dates between tools and systems
Cons
  • –Limited built-in schedule analytics like critical path and float
  • –Resource smoothing and overallocation alerts require outside processes
Use scenarios
  • Product and engineering teams

    Plan sprint-to-release delivery

    Fewer stale dates across squads

  • Operations program managers

    Coordinate cross-team work handoffs

    Faster schedule updates after review

Show 1 more scenario
  • Systems integration teams

    Sync plans from external tools

    One timeline view across systems

    Engineering operations uses the API to sync task dates and dependencies from internal planning sources.

Best for: Fits when teams want timeline visibility driven by task workflows and integrations.

#6

Ganttic

vertical specialist

Resource-focused Gantt scheduler for planning people, equipment, and facilities across projects.

7.7/10
Overall
Features7.7/10
Ease of Use7.7/10
Value7.7/10
Standout feature

Milestone diamond markers with dedicated milestone tracking inside the interactive Gantt view.

Ganttic targets planning teams that need interactive Gantt charts with dependency-aware scheduling and frequent status updates. It supports work breakdown structure style planning with tasks, milestones, and relationships, plus bar and milestone styling controls for readable views.

Pros
  • +Interactive Gantt rendering supports quick drag-style schedule adjustments
  • +Baselines enable baseline comparison for schedule slippage review
  • +Dependency linking modes help keep predecessor successor timing consistent
  • +Milestone tracking provides dedicated milestones instead of task-only markers
Cons
  • –Resource leveling and smoothing coverage is limited for complex capacity scenarios
  • –Advanced earned value management style reporting needs process workarounds
  • –Subproject nesting stays shallow for large program portfolio hierarchies
  • –Admin and governance controls require setup discipline for consistent RBAC
Use scenarios
  • Portfolio planners and program managers

    Coordinate cross-project milestones and dependencies

    Tighter cross-project alignment

  • Project managers and PMO teams

    Forecast delivery dates from schedule changes

    Earlier delivery risk visibility

Show 2 more scenarios
  • Planning teams and delivery managers

    Re-plan intake with alternative dates

    Faster intake evaluation

    Test revised dates, assignments, and workload levels before approving new work in the schedule.

  • Project and resource managers

    Balance shared-resource workloads across projects

    Fewer capacity conflicts

    Review resource assignments across workstreams and adjust dates to reduce overallocation conflicts.

Best for: Fits when planning teams want interactive dependency planning and baseline slippage views without heavy program-level governance.

#7

Tom's Planner

SMB

Web-based Gantt chart tool for creating visual project timelines without spreadsheet complexity.

7.5/10
Overall
Features7.5/10
Ease of Use7.6/10
Value7.4/10
Standout feature

Recurring baselines that keep multiple planning snapshots for schedule slippage and baseline variance comparisons.

Tom's Planner renders interactive Gantt charts from task lists with dependency links and milestone markers. It supports recurring baselines so a schedule can be compared against prior planning snapshots.

Pros
  • +Fast interactive Gantt rendering with dependency-linked bars
  • +Recurring baselines enable schedule comparison against planned snapshots
  • +Milestone markers and percent-complete tracking for status visibility
  • +Calendar exceptions and bar styling overrides for clearer timelines
Cons
  • –Dependency linking modes are limited compared with advanced scheduling engines
  • –Resource views are basic for resource leveling and smoothing workflows
  • –Schedule automation is lighter than earned-value driven planning setups
  • –Governance tooling for approvals and audit logs is not built around enterprise RBAC
Use scenarios
  • Project managers and teams

    Build visual schedule from tasks

    Clear timetable with visible sequence

  • Project controls teams

    Review schedule changes over time

    Historical reference for timeline changes

Show 2 more scenarios
  • Project leads and stakeholders

    Track checkpoints and phase progress

    Visible delivery checkpoints

    Leads place milestones on the timeline and update progress to keep phase status visible.

  • Small organizations

    Review multiple project timelines

    Consolidated planning view

    Teams review several manageable timelines for basic cross-project awareness when portfolio scope stays limited.

Best for: Fits when planning teams need interactive Gantt editing with baselines and clear milestone status communication.

#8

Zoho Projects

SMB

Project planning application with Gantt charts, task dependencies, and resource utilization charts.

7.2/10
Overall
Features7.2/10
Ease of Use7.2/10
Value7.2/10
Standout feature

Baselines store prior schedule snapshots and drive schedule variance views within the same project plan.

Zoho Projects pairs interactive Gantt rendering with Zoho’s broader work-management suite, so schedule plans and task data can flow into related modules. It supports dependency linking, milestone tracking, and percent-complete tracking inside a shared project work breakdown structure.

Pros
  • +Interactive Gantt editing stays synchronized with task fields and status
  • +Baselines support schedule variance reporting against prior snapshots
  • +Dependency linking modes help visualize predecessor and successor effects
  • +RBAC controls integrate with Zoho org administration and user provisioning
Cons
  • –Resource-leveling style planning tools are limited compared with dedicated schedulers
  • –Advanced constraint-based scheduling needs careful manual configuration
  • –Gantt export coverage can feel inconsistent across view formats
  • –Complex dependency graphs can become harder to manage at scale
Use scenarios
  • Collaborative project teams

    Attach discussions to milestones

    Follow-up context tied to plan

  • Project managers and delivery teams

    Break delivery into dependent tasks

    Coordinated plan with deadlines

Show 2 more scenarios
  • Department leaders

    Review progress using reporting views

    Shared view of delivery health

    Managers use burndown, status, and project reporting views to track delivery progress and remaining work.

  • Technical project administrators

    Automate repetitive project operations

    Less manual administration

    Administrators apply workflow automation to update project operations consistently and reduce manual coordination.

Best for: Fits when planning teams want Gantt planning plus Zoho task workflow automation under consistent RBAC.

#9

ClickUp

SMB

Productivity platform with a Gantt view supporting drag-to-shift dependencies and milestone tracking.

6.9/10
Overall
Features6.9/10
Ease of Use6.9/10
Value6.9/10
Standout feature

ClickUp Automations can sync timeline-relevant fields when tasks change status, dates, or assignees.

ClickUp is distinct in how it merges task management with Gantt-style planning inside one workspace. It supports dependency linking, baseline snapshots, and percent-complete tracking on timeline bars, which makes plan history usable after changes.

Pros
  • +Gantt bars reflect dependency links and predecessor-successor mapping across tasks
  • +Baselining snapshots capture schedule deltas for later baseline variance review
  • +Nested subprojects help maintain work breakdown structure inside the timeline
  • +Event automation can update fields tied to planning workflows
Cons
  • –Large Gantt views can feel heavy when many tasks render at fine time scales
  • –Earned value style reporting needs extra configuration beyond percent-complete tracking
  • –Advanced scheduling behavior still needs governance for consistent start and due dates
  • –Resource-leveling style workflows require more manual setup than dedicated schedulers
Use scenarios
  • Project managers

    Coordinate delivery across departments

    Shared view of milestones and progress

  • Individuals and freelancers

    Manage personal tasks and longer projects

    Daily tasks and projects in one place

Show 2 more scenarios
  • Team leads and managers

    Connect goals to milestones and tasks

    Easier target-to-execution tracking

    Leads link goals with projects, tasks, milestones, and dashboards to monitor progress toward targets using Gantt planning views.

  • Product and design teams

    Link design decisions to execution work

    Design rationale stays connected

    Product teams create specifications and design documents, link decisions to tasks, and manage review stages with baseline snapshots.

Best for: Fits when planning teams want timeline views tied to task execution and automation in one system.

#10

GanttPRO

SMB

Gantt chart application with task dependencies, milestones, and resource management.

6.5/10
Overall
Features6.5/10
Ease of Use6.5/10
Value6.5/10
Standout feature

Baselining snapshots support baseline comparison directly inside the Gantt view for schedule slippage tracking.

GanttPRO renders interactive Gantt charts with dependency links and milestone markers for planning teams managing multi-week schedules. GanttPRO supports baselining workflows for baseline comparison, schedule slippage tracking, and visual percent-complete updates on task bars.

Pros
  • +Interactive Gantt rendering with dependency links and milestone markers
  • +Baselining snapshots enable baseline comparison and schedule variance review
  • +Timescale zoom and bar styling overrides improve readability in reviews
  • +Percent-complete tracking keeps schedules aligned to progress updates
Cons
  • –Dependency linking modes can feel limited for complex predecessor-successor mapping
  • –Advanced schedule analysis like critical chain analysis needs manual planning work
Use scenarios
  • Project managers

    Plan dependencies that drive dates

    Coordinated timeline with impacts

  • Program coordinators

    Consolidate milestones across teams

    Consolidated view of major schedules

Show 2 more scenarios
  • IT rollout teams

    Sequence handoffs for rollouts

    Shared rollout plan with sequencing

    Teams plan multi-step technology work with dependencies and rollout milestones to track cross-team handoffs.

  • Project stakeholders

    Review variance against baseline

    Clear drift from original plan

    Stakeholders compare an active schedule with its baseline plan to track schedule slippage during execution.

Best for: Fits when teams need interactive Gantt charts with baselining and progress tracking for recurring schedule reviews.

Conclusion

After evaluating 10 project gantt chart software, ProjectManager stands out as our overall top pick — it scored highest across our combined criteria of features, ease of use, and value, which is why it sits at #1 in the rankings above.

Our Top Pick
ProjectManager

Use the comparison table and detailed reviews above to validate the fit against your own requirements before committing to a tool.

Frequently Asked Questions About Project Gantt Chart Software

How do Celoxis and TeamGantt handle dependency linking and percent-complete rollups in an interactive Gantt view?
Celoxis builds interactive Gantt schedules from structured project work and rolls percent-complete across dependent tasks for variance-ready reporting. TeamGantt supports dependency links and baseline views for schedule comparison, with rolling status updates reflected in the Gantt without manual chart rebuilding.
What breaks if a team needs baseline comparison inside the Gantt view instead of only in reports?
ProjectManager and GanttPRO both support baseline snapshots, but GanttPRO is built around baseline comparison directly inside the interactive Gantt timeline for schedule slippage tracking. Tom's Planner supports recurring baselines for snapshot comparison, but its emphasis is on clear milestone status communication and exporting for handoffs rather than embedding all variance views in-chart.
How do Asana and Monday.com drive automation to keep timeline dates consistent with task status?
Asana’s automation rules can propagate schedule-relevant changes from task status to timeline dates, which keeps timeline bars tied to task records. Monday.com automation updates dependent tasks and key date fields when plan fields change across the same board data model.
Which tools in the list offer portfolio-style nesting that keeps subprojects visible inside the same planning structure?
Celoxis supports portfolio management with nested subprojects plus shared plans, so cross-project staffing and schedule drift can be tied to progress. TeamGantt also supports portfolio-style planning through nested projects and subproject inclusion, but Celoxis couples that structure to portfolio baselining snapshots and variance views.
When does rolling schedule review work better in GanttPRO versus ProjectManager?
GanttPRO is designed for recurring schedule reviews with interactive timescale zoom, bar styling overrides, and baseline workflows for schedule slippage tracking inside the Gantt. ProjectManager supports interactive Gantt rendering with baseline snapshots and percent-complete tracking, but its reporting focus turns schedule and progress data into status outputs rather than making the chart itself the variance dashboard.
How do ClickUp and Zoho Projects preserve plan history after changes to dates and assignments?
ClickUp supports baseline snapshots and percent-complete tracking on timeline bars so plan history stays usable after timeline changes. Zoho Projects stores prior schedule snapshots as baselines and drives schedule variance views within the same project plan while keeping RBAC aligned across Zoho workspaces.
What are the practical differences between Ganttic and GanttPRO for milestone tracking and visual status communication?
Ganttic provides milestone diamond markers with dedicated milestone tracking inside the interactive Gantt view, which supports frequent status updates at milestone level. GanttPRO emphasizes milestone markers and bar styling overrides for readability during reviews, with schedule slippage and percent-complete tracking built around its baselining workflows.
Which tool is better suited for planning teams that already manage execution in board records rather than task-first workflows?
Monday.com fits teams that standardize execution in boards because the timeline view links work items to dependencies and dates within a structured board data model. Asana can show timeline views through dependency links, but its center of gravity is task workflow records and automation-driven timeline updates rather than board-first structure.
How do Celoxis and Asana differ in admin controls for multi-project visibility and auditability?
Celoxis includes admin controls for role-based access plus audit trails and workspace governance for multi-project visibility. Asana’s control surface is tied to its work management workspace model with automation and a broad API, so auditability and governance hinge on workspace permissions and integration patterns rather than portfolio-specific governance modules.

Tools reviewed

Primary sources checked during evaluation.

Referenced in the comparison table and product reviews above.

How to Choose the Right Project Gantt Chart Software

What separates project gantt chart software options is how well they translate plans into controlled schedules and how reliably they stay in sync as work changes. The biggest differences show up in baseline management, dependency behavior, automation via API, and governance features like RBAC.

Baseline management for schedule drift

Why it matters

Baseline management for schedule drift matters when you need to compare “what we said” versus “what happened” without losing context during revisions. It keeps conversations grounded when dates move and scope gets adjusted.

How to check

Import or create a small plan, then save a baseline and later change a few task dates. Verify the view can compare baseline versus current and that the baseline remains preserved after edits.

Dependency rules and schedule calculation

Why it matters

Dependency rules and schedule calculation determine whether the Gantt behaves like your methodology when tasks move. If dependencies don’t compute predictably, the chart becomes an illustration instead of a planning tool.

How to check

In a demo plan, create a finish-to-start relationship with a lag, then adjust the predecessor date and watch the successor shift. Confirm the app clearly shows the dependency impact and recalculates consistently across edits.

API and automation for task updates

Why it matters

API and automation for task updates matter when schedules are driven by tickets, issues, or internal workflows. You reduce manual rework and keep the Gantt aligned with operational changes.

How to check

Ask the vendor for an example integration or request an API walkthrough that updates tasks and dependencies. Then check whether the sample supports updating dates/status and returns updated schedule outcomes.

Resource capacity handling signals

Why it matters

Resource capacity handling signals matter when your timeline depends on real availability, not just dates. They help you spot bottlenecks early and avoid downstream surprises.

How to check

Set up at least two tasks with overlapping timing and assign them to the same resource/capacity. Verify the product flags overallocation (or the equivalent signal) and shows where the conflict comes from.

RBAC and audit log for schedule changes

Why it matters

RBAC and audit log for schedule changes protect the plan when multiple teams contribute. You want a clear trail of who changed what and which actions were permitted.

How to check

In a demo, create at least two roles with different permissions, then attempt to edit tasks under a restricted role. Confirm the app records schedule changes with timestamps and actor identity (audit log or equivalent) and can be reviewed later.

Red flags

  • Baselines get overwritten when you edit tasks
  • Dependencies recalculate unpredictably or hide the real impact
  • Schedule changes aren’t attributable in an audit trail

Fit by situation

  • If we frequently compare planned dates to outcomes, prioritize baseline management for schedule drift.
  • If our schedule changes are driven by work tracking systems, prioritize API and automation for task updates.
  • If multiple teams maintain the plan with different permissions, prioritize RBAC and audit log for schedule changes.

What changed in this review

Updated

New in this edition3

  • CeloxisFits when mid-size portfolios need dependency-driven Gantt plus baselining and governance…
  • GantticFits when planning teams want interactive dependency planning and baseline slippage views…
  • Tom's PlannerFits when planning teams need interactive Gantt editing with baselines and clear…

Rotated out of our best list3

  • LiquidPlanner
  • Microsoft Project for the web
  • Smartsheet

We pick this list from a vetted pool in our market research. Market leaders stay; the other places can change with each update.

Commissioned Research

Funding and competing interests

This study was co-funded by several of the vendors assessed in it. No single vendor funded it. Funders could propose the market studied.

They had no role in selecting vendors, setting or weighting criteria, analysing data or drawing conclusions, and they received the same factual-accuracy check as every other vendor assessed.

Market definition, inclusion rules and criteria weights were fixed by an editor before research began and did not change afterwards. Editorial process →

Keep exploring

FOR SOFTWARE VENDORS

Not on this list? Let’s fix that.

Our best-of pages are how many teams discover and compare tools in this space. If you think your product belongs in this lineup, we’d like to hear from you—we’ll walk you through fit and what an editorial entry looks like.

Apply for a Listing

WHAT THIS INCLUDES

  • Where buyers compare

    Readers come to these pages to shortlist software—your product shows up in that moment, not in a random sidebar.

  • Editorial write-up

    We describe your product in our own words and check the facts before anything goes live.

  • On-page brand presence

    You appear in the roundup the same way as other tools we cover: name, positioning, and a clear next step for readers who want to learn more.

  • Kept up to date

    We refresh lists on a regular rhythm so the category page stays useful as products and pricing change.