GITNUXSOFTWARE REVIEW
Manufacturing & EngineeringTop 10 Best Crane Lift Planning Software of 2026
Editorial roundup comparing crane lift planning software tools like Liebherr LTR Crane Planner 2.0, for selecting fit and workflow tradeoffs in projects.
How we ranked these tools
Vendors set the topic, but our editors set the inclusion criteria and the evaluation framework before research starts.
AI search agents find sources, extract figures with provenance, and aggregate written reviews. They also transcribe video reviews and podcasts.
Framework: Features 40% · Ease 30% · Value 30%
Gitnux may earn a commission through links on this page. This does not influence our reviews. Editorial policy
Liebherr LTR Crane Planner 2.0 is the best pick for crews that standardize on Liebherr cranes and need repeatable lift plan outputs because it handles rigging and hook block weights directly from Liebherr configuration inputs, reducing chart lookup and transcription errors, while K-D2 PLANNER fits engineering teams that want revision-bound approvals tied to the exact computed plan package.
Editor’s top 3 picks
Three quick recommendations before you dive into the full comparison below — each one leads on a different dimension.
Liebherr LTR Crane Planner 2.0
Rigging and hook block weight handling tied to Liebherr crane configuration inputs during lift plan generation.
Best for: Fits when crews standardize on Liebherr cranes and need repeatable lift plan outputs with rigging mass accounted.
K-D2 PLANNER
Editor pickLift plan approval is revision-bound, keeping reviewer decisions attached to the exact computed plan package.
Best for: Fits when engineering teams need controlled, revisioned lift plan approvals tied to load calculations.
Cranimax
Editor pickLift plan output generation that ties crane configuration inputs to approval-ready documentation packages.
Best for: Fits when lift planning teams need repeatable workflow automation and consistent crane documentation across projects.
Comparison Table
Liebherr LTR Crane Planner 2.0
vertical specialistCrane lift planning tool from Liebherr for lattice boom crawler cranes.
Rigging and hook block weight handling tied to Liebherr crane configuration inputs during lift plan generation.
Liebherr LTR Crane Planner 2.0 turns crane and rigging inputs into lift plan outputs, using Liebherr load and configuration data. The tool focuses on planning workflows that calculate rigging mass, hook block weight, and capacity constraints while producing lift documentation for review.
It is designed around Liebherr equipment assumptions and output formats that fit contractor internal approval loops rather than general-purpose document authoring. Teams that standardize on Liebherr cranes typically get faster planning cycles than those relying on spreadsheet-style interpolation and manual chart lookups.
- +Uses Liebherr crane data to reduce chart lookup and transcription errors
- +Computes rigging and hook block weights from configurable rigging inputs
- +Generates lift plan outputs aligned to crane configuration steps
- +Supports lift planning review flow with consistent inputs and outputs
- –Planning accuracy depends on correct Liebherr equipment selection
- –Limited fit for mixed-fleet planning when other OEM capacity data is needed
- –Automation relies on interactive configuration rather than external model ingestion
- –3D lift visualization is not the primary workflow emphasis compared with planning outputs
Lift planners and crane engineers
Generate documented plan assumptions
Assumptions captured
Experienced crane teams
Plan coordinated multi-crane lifts
Coordinated review
Show 1 more scenario
Operations teams
Validate capacity before site work
Setup risks surfaced
Check rigging mass, hook block weight, and constraints against planning capacity limits before execution.
Best for: Fits when crews standardize on Liebherr cranes and need repeatable lift plan outputs with rigging mass accounted.
K-D2 PLANNER
enterpriseAutodesk Revit add-in for crane lift planning with 4D sequencing, capacity verification, and collision checks.
Lift plan approval is revision-bound, keeping reviewer decisions attached to the exact computed plan package.
K-D2 PLANNER’s core workflow starts with crane configuration selection and rigging configuration inputs, then produces lift plan artifacts linked to calculated load results. The approval workflow keeps lift plan status tied to a specific revision rather than an editable spreadsheet state, which reduces ambiguity during critical lift reviews. Site plan import supports anchoring the lift planning model to project context for clearance and exclusion zone evaluation.
A key tradeoff is that lift plan modeling depth depends on how thoroughly project geometry and rigging details are supplied at intake, because incomplete site import or missing rigging weights limits calculation credibility. K-D2 PLANNER fits teams that repeatedly deliver engineered lift packages and need consistent plan structure across projects with controlled approval gates.
- +Revision-linked lift plan approval workflow reduces review ambiguity
- +Load chart driven gross and net load outputs support consistent validation
- +Site plan import anchors crane geometry for clearance checks
- +Structured inputs keep rigging weight and configuration traceable
- –Effective modeling requires complete site import and rigging detail
- –Automation beyond manual plan entry depends on integration setup
- –Some 3D lift visualization workflows feel less streamlined than CAD-first tools
Lift planning engineers
Engineered lift package with approvals
Fewer rework loops
Project HSE reviewers
Exclusion zone and clearance checks
Faster safety signoff
Show 2 more scenarios
Crane operators and supervisors
Multi-crane coordination planning
Reduced coordination errors
Use consistent plan structure to align configuration assumptions across multiple crane planning scenarios.
General contractors
Standardizing lift plan templates
More predictable approvals
Enforce standardized lift plan workflow and revision history for repeatable engineered lift submissions.
Best for: Fits when engineering teams need controlled, revisioned lift plan approvals tied to load calculations.
Cranimax
vertical specialist3D crane lift planning software for mobile and crawler cranes.
Lift plan output generation that ties crane configuration inputs to approval-ready documentation packages.
Cranimax is crane lift planning software that focuses on turning lift inputs into reviewable lift plan outputs for site teams. It supports the practical workflow of calculating crane configuration needs and producing documentation tied to a lift plan approval workflow.
The strongest fit is teams that want automation around load chart lookups and lift configuration inputs, then reuse those results across repeated lifts. Cranimax is also positioned for integration into crane planning processes that start from site plan imports and end with consistent documentation packages.
- +Automates crane capacity chart input handling to reduce manual chart work
- +Generates lift plan outputs aligned to lift plan approval workflow needs
- +Supports site plan import so planning inputs stay grounded in the location
- +Designed for repeatable planning so multi-crane lift documentation stays consistent
- –Crane configuration depth can require careful upfront parameter selection
- –Limited visibility into how intermediate calculations map to each documentation artifact
Lift planners
Automate load chart lookups
Faster plan cycles
Site teams
Reuse results across repeated lifts
Consistent re-plans
Show 1 more scenario
Crane engineering teams
Package approvals from site imports
Repeatable documentation
Integrate planning that starts from site plan imports and ends with lift plan documentation for review.
Best for: Fits when lift planning teams need repeatable workflow automation and consistent crane documentation across projects.
Manitowoc Crane Control System Planner
vertical specialistCrane configuration and lift planning tools from Manitowoc for Grove and Potain cranes.
Manitowoc-specific planning logic links crane configuration inputs to feasibility checks with visualization for clearance review.
Manitowoc Crane Control System Planner is most relevant for crane planners who need consistent results against Manitowoc crane capacity information and rigging assumptions. The workflow is oriented around calculating gross and net load and then validating against operational limits tied to the selected crane configuration. It also provides 3D lift visualization so planners can review clearance and obstruction assumptions in the same session. Compared with Excel and Confluence, the crane-specific constraint checks reduce manual transcription errors and make lift plan revisions easier to audit.
- +Crane-data-driven capacity checks tied to configured boom and counterweight settings
- +3D lift visualization supports clearance review during lift plan iterations
- +Computations align gross load and net load assumptions in one planning workflow
- +Fewer copy and paste steps than Excel during revision cycles
- –Accurate configuration inputs are required for trustworthy lift path results
- –General office collaboration features are thinner than Confluence-style documentation hubs
- –Integration depth for external systems like construction schedules appears limited versus AEC platforms
- –Planning files can be harder to standardize across contractors without tight process
Crane lift planning engineers
Engineered lift validation with Manitowoc cranes
Faster approval-ready revisions
Rigging and site operations teams
Review obstruction and clearance assumptions
Reduced field clarification loops
Show 1 more scenario
Project controls groups
Standardize load assumptions across projects
More consistent load calculations
Centralized crane configuration logic lowers spreadsheet drift during multi-project planning cycles.
Best for: Fits when crane planning teams need repeatable Manitowoc capacity validation with reviewable 3D lift assumptions.
Tadano HELLO-MAP
vertical specialistLift planning support tool from Tadano for mobile crane operations.
Lift plan approval workflow tied to Tadano configuration inputs and 3D visualization review context.
Tadano HELLO-MAP centers on building a lift plan using crane capacity chart logic from Tadano datasets and then linking the plan to a visual site view. The workflow is oriented around lift plan approval stages, so reviewers can validate configuration choices before field execution. The most practical fit appears when plans must stay consistent across a fleet that uses compatible Tadano models.
- +Approval workflow keeps lift plan review structured and auditable
- +Tadano equipment datasets reduce manual capacity input errors
- +3D lift visualization helps validate spatial clearances
- +Repeatable configuration patterns reduce rework on recurring jobs
- –Non-Tadano crane libraries can limit coverage for mixed fleets
- –Complex rigging inputs take time to model correctly
Tower crane coordinators
Reviewing configured lifts for approval
Fewer back-and-forth revisions
Site planning engineers
Validating clearance before mobilization
Earlier obstruction issues found
Show 1 more scenario
Crane operators
Reusing validated configurations on repeats
Quicker planning turnaround
Operators reuse prior configuration patterns to reduce modeling effort on similar jobs.
Best for: Fits when teams plan repeat lifts on compatible Tadano cranes and need structured approval cycles.
Hiab HiCrane
vertical specialistLoader crane operation planning and simulation tool from Hiab.
Hiab equipment configuration alignment that drives lift plan outputs and approval-ready documentation.
Hiab HiCrane is crane lift planning software focused on generating lift plan content for Hiab equipment and workflows used on job sites. It supports configuration-driven lift calculations that connect crane setup inputs like boom length and working radius to an engineered lift output.
- +Crane setup inputs map directly to lift plan outputs used in approvals
- +Workflow supports structured lift plan review instead of email-only handoffs
- +Configuration focus reduces rework when planning repeat jobs with known cranes
- +Best fit for teams standardizing around Hiab crane fleets
- –Thin fit for mixed-brand crane fleets without heavy manual normalization
- –Less suitable for highly custom lift path and clearance modeling than CAD-first tooling
- –Automation depth depends on how consistently project data is provisioned
- –External integration options can be limiting versus general construction workflow suites
Hiab engineering teams
Generate engineered lift outputs
Engineered lift output
Job site operations teams
Standardize lift plan production
Fewer ad hoc models
Show 1 more scenario
Lift plan reviewers
Follow controlled approval sequence
Controlled review
Run internal lift plan workflow steps so approvals follow the same sequence each time.
Best for: Fits when lift planning relies on Hiab crane configurations and needs approval workflow control.
DigiDocs Lift Plan
SMBLift plan software with automatic critical-lift detection, ground bearing pressure calculation, and digital crew sign-off.
Lift plan approval workflow ties planning edits to versioned lift plan documents.
DigiDocs Lift Plan is a crane lift planning workflow focused on producing structured lift plan documents from inputs like crane configuration and load conditions. It supports lift plan approval workflow steps and document versioning so teams can route changes through review cycles.
- +Lift plan approval workflow keeps changes linked to document versions
- +Document-centered workflow reduces copy-paste between calculation notes and signoff packets
- +Consistent inputs for crane configuration and load conditions support repeatable planning
- +Shared lift plan workspace supports coordinated review across engineering and site teams
- –API and automation surface is limited for deep integrations into enterprise systems
- –3D lift visualization and CAD workflow coverage is narrower than tools built around BIM-centric pipelines
Crane engineers
Route changes through versioning
Traceable revisions
Lift plan reviewers
Review structured approval steps
Less handoff friction
Show 1 more scenario
Operations coordinators
Standardize approved lift documentation
Fewer manual edits
Reduce spreadsheet-driven manual transfers by linking engineering notes to the approved document record.
Best for: Fits when teams need approval-controlled lift plan documents with repeatable inputs.
LiftPlanner
vertical specialist3D crane and rigging lift planning software built for AutoCAD with custom crane fleet models.
3D lift visualization tied to the same computed inputs used for the lift plan approval workflow.
LiftPlanner builds crane lift plan worksheets with calculated loads, configuration inputs, and an approval-ready workflow for lift plan approval. The system supports lift plan creation for single-crane and multi-crane scenarios and generates consistent documentation from the same underlying inputs.
- +Calculation-driven lift plan worksheets reduce manual reconciliation work
- +3D lift visualization supports review of spatial constraints and lift path clearance
- +Repeatable inputs produce consistent documentation across teams
- +Approval workflow keeps lift plan approval workflow auditable by design
- –Crane configuration coverage can feel rigid for unusual engineered lift setups
- –External integration options are narrower than construction-platform ecosystems
Lift engineers and crane planners
Prepare engineered lift worksheets
Key setup assumptions captured
Lift engineers and experienced crews
Coordinate tandem lift constraints
Coordinated execution
Show 2 more scenarios
Lift engineers and operations teams
Validate clearance and exclusions
Potential issues flagged
Check lift path clearance and exclusion zone constraints against configuration inputs before execution.
Construction schedulers and dispatch teams
Plan crane bookings and roles
Improved schedule visibility
Coordinate crane schedules using plan inputs to align timing with operator and rigger assignment needs.
Best for: Fits when crane contractors or rigging teams need reviewable lift plans with 3D checks and controlled approvals across projects.
Sany Crane Planner
vertical specialistOEM crane planning software for Sany mobile and crawler cranes.
Sany-specific crane and rigging configuration inputs drive capacity chart calculations for lift plan feasibility without manual rebuilds.
Sany Crane Planner targets crane lift planning workflows for teams that need repeatable lift plan approval outputs tied to Sany crane and rigging inputs. It focuses on capacity chart driven calculations and the geometry checks required to validate working radius, boom configuration, and rigging weights for a planned lift.
- +Uses Sany-oriented inputs to produce lift plan outputs aligned to crane configuration choices
- +Capacity chart calculation workflow supports interpolated feasibility checks for planned positions
- +Supports iterative lift plan revisions by updating configuration and rigging parameters
- +Planning context inputs reduce manual rework when changing crane placement or constraints
- –Deep planning relies on crane-specific data coverage and may not fit mixed OEM fleets
- –External integration and automation surface is limited compared with construction platform ecosystems
- –Multi-crane and tandem lift planning workflows are less explicit than in leading planning suites
- –3D lift visualization depth depends on the availability and format of imported site data
Lift planners
Calculate feasibility from capacity charts
Feasible configuration
Engineering teams performing checks
Validate rigging weights and geometry
Review-ready checks
Show 2 more scenarios
Site planning coordinators
Incorporate crane position constraints
Context-aware plans
Handle site inputs such as crane position and constraints to determine lift feasibility for the selected configuration.
Project teams iterating options
Reproduce results across revisions
Repeatable revisions
Repeat what-if iterations so lift plan results remain reproducible across configuration changes.
Best for: Fits when Sany crane teams need repeatable lift plan calculations with configuration-driven revisions and consistent outputs.
A1A Software Cranesoft
vertical specialistCrane planning and management software for construction contractors.
Lift plan tasking that links crane configuration and rigging inputs to approval-ready planning outputs.
A1A Software Cranesoft supports crane lift planning workflows with configurable calculation inputs and lift plan output for review and approval. It is differentiated by its focus on lift plan tasking tied to crane configuration decisions, including rigging weight and boom geometry parameters used in engineering checks.
- +Configurable crane and rigging inputs to standardize gross and net load calculations
- +Lift plan records tie configuration decisions to calculation outputs
- +Structured lift plan documentation for review and approval workflows
- +Supports multi-crane planning setup within a single planning context
- –Automation and API surface are limited compared with Autodesk Construction Cloud integrations
- –3D lift visualization and site import workflows are not the strongest documented differentiator
Lift planners and engineers
Produce tasking-driven lift outputs
Configuration traceability
Engineering documentation teams
Connect checks to lift plan records
Connected documentation
Show 1 more scenario
Project teams running repeat lifts
Repeat structured planning iterations
Reduced calculation drift
Use configurable inputs to recreate lift plan calculations and export consistent review artifacts across revisions.
Best for: Fits when teams need structured lift plan documentation and repeatable engineering checks.
Conclusion
After evaluating 10 crane lift planning software, Liebherr LTR Crane Planner 2.0 stands out as our overall top pick — it scored highest across our combined criteria of features, ease of use, and value, which is why it sits at #1 in the rankings above.
Use the comparison table and detailed reviews above to validate the fit against your own requirements before committing to a tool.
Frequently Asked Questions About Crane Lift Planning Software
How does K-D2 PLANNER connect computed lift plans to the approval workflow?
Which tools keep crane configuration logic centralized to reduce spreadsheet drift?
What breaks if rigging weight assumptions are missing in Liebherr LTR Crane Planner 2.0?
How does LiftPlanner handle 3D checks during lift plan approval?
When do Tadano HELLO-MAP teams see the most value from repeating jobs?
How does Cranimax fit when planning workflows start from site plan inputs?
Which tools are built around equipment-specific data models instead of generic worksheets?
How do admin controls and auditability show up in multi-user lift plan workflows?
What integration and data exchange tasks are typically required to connect lift planning to site CAD or project systems?
Tools reviewed
Primary sources checked during evaluation.
Referenced in the comparison table and product reviews above.
How to Choose the Right Crane Lift Planning Software
We separate crane lift planning options by how reliably they turn a site and load intent into an approved lift workflow, then how well they preserve engineering traceability when inputs change. Look closely at data import coverage, the clarity of load-capacity checks, and whether 3D lift visualization helps catch clearance issues before field time.
Input file and site model import coverage
Why it matters
Input coverage matters because missed data (or manual retyping) can quietly break lift calculations and workflow handoffs. For crane lift planning software, it determines whether teams can move from field measurements or CAD outputs into a consistent lift record.
How to check
In the demo, ask them to import a sample site plan and a crane/load drawing (or provide an example dataset) and describe what becomes a usable constraint vs. what must be redrawn. Verify the import preview shows units, coordinate alignment, and what happens when a layer or geometry is missing.
Capacity check transparency with assumptions
Why it matters
Capacity check transparency matters because teams need to see what the software used, not just the pass/fail result. Crane lift planning depends on readable assumptions so plan reviewers and field crews can trust the lift decision and reconcile discrepancies.
How to check
Request a lift that is close to a limit and run the plan. During review, look for a clear breakdown of the governing constraints, the exact inputs used, and any warnings the software generates when assumptions are incomplete.
Lift plan workflow with role handoffs
Why it matters
Lift plan workflow with role handoffs matters because crane lifts often move between preparers, reviewers, and sign-off holders. Strong workflow control reduces plan drift by locking status, recording who changed what, and keeping approvals tied to a specific revision.
How to check
Ask to see a sample lift workflow end-to-end: draft, review, revision, and sign-off. Confirm whether the system requires specific roles per step, shows a revision history, and locks the approved version while allowing a controlled amendment path.
Revision history and audit trail granularity
Why it matters
Revision traceability matters when a site condition changes mid-prep. Crane lift planning software should preserve an audit trail that answers what changed, why it changed, and which downstream checks updated with it.
How to check
In the demo, change one input (e.g., load intent or geometry constraint) after an earlier approval and compare old vs. new results. Check that the audit log captures the field-level change, timestamps, author, and the recalculated sections of the lift record.
3D visualization for clearance and exclusion zones
Why it matters
Clearance review matters because many lift issues are spatial and only show up when boom, load, and obstructions align in 3D. Visualization that supports exclusion zone review can help the team find conflicts before the field schedule locks in.
How to check
Ask them to load a sample with known obstructions and run a conflict review. Confirm the visualization lets you inspect the lift path framing, highlights which areas are blocked, and exports stills or a report tied to a specific lift revision.
Red flags
- The import process leaves key geometry or units for manual cleanup without reporting gaps
- Capacity results show only pass/fail with no readable assumptions or governing-constraint explanation
- Approved lifts can be edited without a revision-linked workflow and audit trail
Fit by situation
- If your team relies on CAD and site model handoffs, prioritize Input file and site model import coverage.
- If reviewers must justify lift decisions under changing site conditions, prioritize Lift plan workflow with role handoffs.
- If field crews need visual proof before execution, prioritize 3D visualization for clearance and exclusion zones.
What changed in this review
Updated
New in this edition10
A1A Software CranesoftMarket leader in our current research
CranimaxMarket leader in our current research
DigiDocs Lift PlanFits when teams need approval-controlled lift plan documents with repeatable inputs
Hiab HiCraneMarket leader in our current research
Show 6 more
Liebherr LTR Crane Planner 2.0Market leader in our current research
LiftPlannerFits when crane contractors or rigging teams need reviewable lift plans with 3D checks…
Manitowoc Crane Control System PlannerMarket leader in our current research
K-D2 PLANNERFits when engineering teams need controlled, revisioned lift plan approvals tied to load…
Sany Crane PlannerFits when Sany crane teams need repeatable lift plan calculations with…
Tadano HELLO-MAPFits when teams plan repeat lifts on compatible Tadano cranes and need structured…
Rotated out of our best list10
Autodesk BIM Collaborate Pro
BricsCAD
Confluence
Autodesk Construction Cloud
Jira Software
LibreCAD
Microsoft Excel
SAP S/4HANA Asset Management
Smap3D
Vention
We pick this list from a vetted pool in our market research. Market leaders stay; the other places can change with each update.
Funding and competing interests
This study was co-funded by several of the vendors assessed in it. No single vendor funded it. Funders could propose the market studied.
They had no role in selecting vendors, setting or weighting criteria, analysing data or drawing conclusions, and they received the same factual-accuracy check as every other vendor assessed.
Market definition, inclusion rules and criteria weights were fixed by an editor before research began and did not change afterwards. Editorial process →
- Top 10 Best Planetary Gearbox Design Software of 2026
- Top 10 Best Piping Fabrication Software of 2026
- Top 10 Best Bamboo 3D Printer Software of 2026
- Top 10 Best Bakery Industry Software of 2026
- Top 10 Best Sign Estimating Software of 2026
- Top 10 Best Spares Management Software of 2026
- Top 10 Best 3D Product Configurator Software of 2026
- Top 10 Best Axial Turbine Design Software of 2026
- Top 10 Best Axial Fan Software of 2026
- Top 10 Best Axial Fan Design Software of 2026
- Top 10 Best Permanent Magnet Simulation Software of 2026
- Top 10 Best Perfboard Layout Software of 2026
- Top 10 Best Pdd Software of 2026
- Top 10 Best Pcb Thermal Analysis Software of 2026
- Top 10 Best Pcb Software of 2026
- Top 10 Best Pcb Routing Software of 2026
- Top 10 Best Pcb Schematic Software of 2026
- Top 10 Best Pcb Panelization Software of 2026
- Top 10 Best Pcb Layout Design Software of 2026
- Top 10 Best Pcb Layout Software of 2026
Keep exploring
Comparing two specific tools?
Software Alternatives
See head-to-head software comparisons with feature breakdowns, pricing, and our recommendation for each use case.
Explore software alternatives→In this category
Manufacturing & Engineering alternatives
See side-by-side comparisons of manufacturing & engineering tools and pick the right one for your stack.
Compare manufacturing & engineering tools→