
GITNUXSOFTWARE REVIEW
Construction & InfrastructureTop 9 Best Laboratory Design Services of 2026
Review a roundup of laboratory design services with options from HOK, Gensler, and Perkins&Will, mapping tradeoffs for project teams.
How we ranked these tools
Vendors set the topic, but our editors set the inclusion criteria and the evaluation framework before research starts.
Search agents gather the source set and the review record, including transcriptions of video reviews and podcasts.
Framework: Features 40% · Ease 30% · Value 30%
Gitnux may earn a commission through links on this page. This does not influence our reviews. Editorial policy
HOK is the best pick for lab owners who need coordinated safety intent and BIM-driven engineering alignment because its end-to-end planning weaves containment, casework, and ventilation intent into one coherent design package, while BR+A is the better alternative for research teams that want early workflow-to-adjacency convergence thanks to lab programming and test-fit workshop planning before detailed engineering starts.
Editor’s top 3 picks
Three quick recommendations before you dive into the full comparison below — each one leads on a different dimension.
HOK
HOK’s end-to-end lab planning ties containment, casework and utilities, and ventilation intent into one coherent design package.
Best for: Fits when lab owners need coordinated planning, safety intent, and BIM-driven engineering alignment through delivery.
Perkins&Will
Editor pickMultidisciplinary coordination that links laboratory workflow decisions to mechanical interface constraints during early planning.
Best for: Fits when multidisciplinary lab buildouts need coordinated design intent and buildable documentation.
Gensler
Editor pickCross-disciplinary lab planning that ties ventilation, segregation, and equipment layout decisions into basis of design deliverables.
Best for: Fits when institutions need coordinated lab design packages from programming through construction documents.
Comparison Table
HOK
enterprise_vendorGlobal architecture firm with a dedicated science and technology group.
HOK’s end-to-end lab planning ties containment, casework and utilities, and ventilation intent into one coherent design package.
HOK is a top-ranked fit when laboratory buildouts need tight linkage between workflow mapping, personnel and material flows, and containment intent for each space type. The design process tends to produce clear basis-of-design documentation that helps align stakeholders on ventilation intent, casework and utility placement, and safety constraints. BIM coordination supports constructability by surfacing clashes across labs, mechanical systems, and building envelopes during design development.
A key tradeoff is that HOK’s process emphasizes coordinated delivery artifacts that require sustained stakeholder time from the lab owner, especially when requirements evolve late. HOK works best for projects that need strong integration between lab layout decisions and engineering systems, including pressure cascade logic, exhaust strategy, and commissioning planning alignment for high-spec spaces.
- +Laboratory planning keeps workflow, containment intent, and systems coordination aligned
- +BIM coordination reduces clashes across labs, utilities, and major mechanical elements
- +Safety-driven space decisions improve constructability for constrained lab footprints
- +Delivery support stays consistent from concept to detailed design packages
- –Requires steady client participation when lab requirements change late
- –Advanced containment and exhaust coordination can increase design iteration cycles
- –Coordination-heavy approach may feel heavy for small scope renovations
- –Stakeholder reviews across multiple disciplines add scheduling overhead
Research facility program teams
Plan new labs around containment needs
Fewer late layout and systems changes
EHS and lab operations leads
Translate operational procedures into design intent
Design reflects operational separation rules
Show 2 more scenarios
Design delivery managers
Coordinate trades for complex lab fit-outs
Lower coordination churn during detailing
HOK uses BIM coordination to manage utilities, mechanical systems coordination, and interface points.
Principal investigators
Support flexible lab growth paths
Reusable spaces for future protocols
HOK supports adaptable planning while keeping utilities and safety-driven placement consistent.
Best for: Fits when lab owners need coordinated planning, safety intent, and BIM-driven engineering alignment through delivery.
Perkins&Will
enterprise_vendorGlobal architecture firm with an integrated science and technology design practice.
Multidisciplinary coordination that links laboratory workflow decisions to mechanical interface constraints during early planning.
Perkins&Will operates as a full-service design organization for laboratory facilities, with planning depth that spans user requirement brief input, spatial logic for experiments, and documentation that helps engineering teams translate intent into buildable packages. The firm’s laboratory planning tends to emphasize personnel and material flows, fume hood placement decisions, and operational constraints that affect everyday work in wet labs and support spaces. Integration is strongest when architecture and engineering scopes move together early so that pressure relationships, exhaust strategy, and room-to-room interfaces are treated as one system rather than separate trades.
A tradeoff appears in projects that need heavy configuration of an external platform workflow, because Perkins&Will’s advantage is delivery and coordination rather than software-driven automation for every planning step. Perkins&Will fits usage situations where design teams must converge on basis of design documentation and a coordinated commissioning plan across disciplines, then carry that clarity into procurement and construction coordination. It is less ideal when the organization’s stakeholders primarily need a lightweight, software-first workflow with minimal design documentation.
- +Strong laboratory programming-to-documentation continuity for buildable outcomes
- +Early coordination between planning and mechanical interfaces reduces rework
- +Clear spatial logic for personnel and material flows in lab operations
- +Disciplined basis of design documentation for downstream engineering handoff
- –Greater reliance on design team coordination than on automation-heavy tooling
- –Less suitable for teams needing a software-only planning workflow
University lab facilities teams
Plan wet labs with shared support
Fewer late-stage space changes
Corporate R&D real estate
Upgrade containment-adjacent lab suites
Clearer interfaces for trades
Show 1 more scenario
Engineering design managers
Reduce coordination risk across disciplines
More stable downstream packages
Basis of design outputs support engineering execution without losing planning intent.
Best for: Fits when multidisciplinary lab buildouts need coordinated design intent and buildable documentation.
Gensler
enterprise_vendorGlobal architecture firm with a life sciences workplace and laboratory practice.
Cross-disciplinary lab planning that ties ventilation, segregation, and equipment layout decisions into basis of design deliverables.
Gensler is a strong fit for institutional lab buildouts where teams need coordinated decisions across layout, adjacencies, and life-safety or EHS requirements. The service typically supports workflow mapping for personnel and material flows, then translates those inputs into design packages that address fume hood placement, casework requirements, and exhaust strategy impacts. For campus-scale programs, Gensler’s lab planning process tends to reduce rework by aligning room adjacencies and utility planning early with architectural and MEP design teams.
A tradeoff is that full cross-disciplinary coordination can slow turnaround when decisions are frequently changing late in schematic. Gensler works best when the client can provide enough user requirement brief content to define cleanroom classification needs, containment level targets, and equipment assumptions before late-stage design freezes. For teams that need rapid iterations for multiple conceptual options with minimal input, Gensler may require a stronger internal governance cadence to keep cycles efficient.
- +Facility-scale lab programming that converts workflows into buildable layouts
- +Strong coordination of mechanical needs around exhaust and containment assumptions
- +Documentation depth for basis of design and construction-ready packages
- +Experienced handling of EHS-driven segregation in complex lab suites
- –Late decision churn can increase design cycle length
- –Requires client governance to keep user requirement inputs current
- –Less efficient for small, one-off spaces with minimal stakeholder alignment
- –Integration depth can feel heavy when internal lab standards are immature
Research facilities directors
Campus lab expansion with workflow constraints
Fewer layout and utility conflicts
EHS and compliance leads
EHS-driven segregation and containment planning
More consistent containment assumptions
Show 1 more scenario
Design-build program managers
Design-bid-build lab delivery with documentation depth
Clearer downstream design decisions
Gensler produces basis of design documentation that supports procurement and stakeholder review.
Best for: Fits when institutions need coordinated lab design packages from programming through construction documents.
HDR
enterprise_vendorMultidisciplinary design firm with extensive laboratory planning capabilities.
Facility-wide coordination that ties lab planning adjacencies to mechanical and environmental performance decisions for coherent handoff packages.
HDR delivers laboratory design services that translate functional requirements into buildable facility concepts, with a clear emphasis on coordinated planning across disciplines. The firm’s core work typically covers test-fit planning, adjacency-driven layout decisions, and facility-wide utility and mechanical coordination tied to lab operations.
- +Strong discipline coordination between lab planning and MEP constraints
- +Detailed layout logic that supports casework, flows, and circulation separation
- +Commissioning-oriented planning artifacts aligned to delivery handoffs
- +Proven experience tailoring designs for containment and regulatory environments
- –Collaboration load can be high when requirements change late
- –Integration depth can drop on smaller scope packages without dedicated teams
Laboratory operators and facility owners
Laboratory design for containment needs
Buildable design documentation package
Building owners and design teams
Laboratory design with HVAC integration
Integrated digital model deliverables
Show 2 more scenarios
Healthcare owners and clinical stakeholders
Laboratory design for healthcare planning
Coordinated healthcare planning inputs
Translates clinical workflows into facility layouts, adjacency rules, and room requirements for lab-related spaces.
Infrastructure agencies and project teams
Laboratory design for upgrades planning
Integrated project development inputs
Coordinates engineering disciplines with existing-site information for corridor or treatment plant work that supports labs.
Best for: Fits when multi-discipline lab buildouts require consistent planning decisions through design handoffs.
BR+A
specialistEngineering firm focused on building systems for research and healthcare facilities.
Lab programming and test-fit planning workshops that drive early adjacency decisions for lab and support spaces.
BR+A produces laboratory design deliverables that translate scientific workflows into buildable layouts with coordinated safety, mechanical, and utility planning. The firm’s core strength is disciplined iteration through lab programming and test-fit planning, which helps teams converge on functional adjacencies before design-bid-build handoffs.
- +Strong lab programming support with clear test-fit convergence points
- +Coordinated mechanical and utility planning for lab workflows
- +Good documentation discipline for basis of design continuity
- +Experienced execution across wet labs and support space layouts
- –Later layout changes can trigger rework across engineering coordination
- –Heavier process artifacts can slow stakeholders without strong decision cadence
Research operations teams
Plan new wet lab floors
Faster room layout alignment
Facilities engineering leads
Coordinate utilities and exhaust
Cleaner engineering handoffs
Show 1 more scenario
Project managers
Manage design-bid-build transitions
Lower design ambiguity
BR+A documentation maintains basis of design continuity to support contractor coordination through procurement.
Best for: Fits when research leadership needs tight workflow-to-layout translation before detailed engineering starts.
The S/L/A/M Collaborative
specialistArchitecture and engineering firm with a science and research design practice.
A design process that keeps fume hood placement logic and air exhaust strategy linked to room planning decisions.
The S/L/A/M Collaborative is a laboratory design service firm known for pairing programming and schematic planning with a strong mechanical and utility coordination focus. Core work spans test-fit planning, adjacency and workflow mapping for lab functions, and development of basis of design concepts that translate into constructible drawings.
- +Tight coordination between lab layout decisions and utility distribution assumptions
- +Structured workflow mapping that clarifies personnel and material flows early
- +Detailed containment and exhaust intent carried into documentation sets
- +Practical test-fit planning that supports iterative tenant and lab program changes
- –Documentation depth can require active client review to avoid downstream rework
- –Complex cleanroom and biosafety scenarios demand strong internal decision cadence
- –Integration with lab IT systems is not always the primary delivery emphasis
- –Modular planning outputs can vary in specificity across project phases
Laboratory owners and operators
Laboratory design with workflow mapping
Coherent lab space plan
Design teams on lab buildouts
Laboratory design with exhaust alignment
Safety-aligned design documentation
Show 1 more scenario
Facility planners and program leads
Laboratory design through basis of design
Constructible design concepts
Develops basis-of-design concepts from programming and schematic planning with systems coordination included.
Best for: Fits when lab buildouts need programming plus MEP coordination without splitting responsibilities between firms.
Exyte
specialistGlobal design and construction firm specializing in high-tech and cleanroom facilities.
Engineering integration that carries lab planning constraints into coordinated utilities and buildable layouts.
Exyte is a laboratory design provider that couples end-to-end facility design with an engineering delivery model built for life sciences execution at industrial scale. Core work covers lab programming and test-fit planning inputs, concept through basis-of-design packages, and coordination of mechanical, electrical, and process utilities into buildable lab layouts.
- +Strong cross-discipline coordination between lab layouts and utility distribution
- +Engineering-led design packages that track requirements into detailed execution
- +Experience with regulated life science project constraints and handover expectations
- +Clear constructability focus in how systems are routed through lab zones
- –Heavier process documentation than architecture-led providers
- –Automation-style integration support is less obvious for software-first lab teams
Life sciences program teams
New wet lab and support build
Fewer coordination rework cycles
Facility engineering groups
Expansion of existing laboratory floor
Better system continuity
Show 1 more scenario
EHS and compliance stakeholders
Containment and safety critical labs
More consistent compliance traceability
Exyte carries safety-driven planning into detailed spatial and systems decisions for lab areas.
Best for: Fits when life sciences projects need engineering-driven lab design coordination through detailed delivery.
Affiliated Engineers
specialistEngineering firm specializing in technically complex research facility systems.
MEP-first laboratory ventilation and utility integration built into design development workflows.
Affiliated Engineers delivers laboratory design and engineering services focused on coordinating mechanical, electrical, and plumbing systems around lab workflow needs. Core strengths include detailed discipline integration for HVAC zoning and ventilation strategy, plus utility planning that supports buildable layouts rather than concept-only guidance.
- +Strong MEP coordination for lab ventilation and utilities
- +Engineering depth during programming-to-design-development handoffs
- +Practical safety-focused design coordination for lab environments
- +Good throughput for multi-discipline drawing and review cycles
- –Less visible end-to-end lab architecture option set than top studio firms
- –Heavier reliance on internal discipline coordination can slow early alignment
- –Advanced modeling artifacts may require tighter documentation management
Life science development teams
New wet lab buildout planning
Fewer layout rework cycles
Facilities engineering leads
Containment and safety design iteration
Clearer containment-related decisions
Show 1 more scenario
Project management teams
Multi-discipline coordination through CD
Reduced coordination conflicts
Affiliated Engineers supports consistent drawing sets across mechanical, electrical, and plumbing for lab spaces.
Best for: Fits when laboratory programs need engineering-led discipline integration and construction-stage support.
Payette
specialistArchitecture practice with a strong science and research design portfolio.
Commissioning-oriented documentation that ties system intent to verification activities during handoff.
Payette delivers laboratory design services for research facilities where architecture, MEP coordination, and life-safety intent must hold up from test-fit concepts through construction documents. Teams get detailed wet-lab planning support, with attention to workflow adjacencies and lab support zoning that reduces downstream rework during design development.
- +Strong lab workflow planning that improves adjacency and zoning decisions early
- +MEP coordination work supports consistent utility distribution intent
- +Clear design deliverables that help stakeholders track changes across iterations
- +Commissioning-oriented documentation improves handoff readiness for building systems
- –Design iteration cycles can feel heavy when requirements change late
- –Automation and API surface is not a strength for buyers seeking software integration
University research facilities teams
Wet-lab expansion with support spaces
Fewer late-stage layout revisions
Corporate R&D real estate owners
Multi-team facility reprogramming
Cleaner signoff across groups
Show 1 more scenario
Program managers and PMOs
Design-bid-build planning packages
Smoother coordination during delivery
Payette produces consistent construction document sets that support bid evaluation and coordination with commissioning agents.
Best for: Fits when research teams need architect-led lab planning with construction-ready coordination and review control.
Conclusion
After evaluating 9 laboratory design, HOK stands out as our overall top pick — it scored highest across our combined criteria of features, ease of use, and value, which is why it sits at #1 in the rankings above.
Use the comparison table and detailed reviews above to validate the fit against your own requirements before committing to a tool.
Frequently Asked Questions About Laboratory Design
How do HOK and Gensler differ in workflow mapping when converting adjacency decisions into ventilation and exhaust strategy?
What onboarding inputs should teams provide to Payette and HDR so design handoffs reflect commissioning and validation needs rather than just space planning?
When do BR+A and Exyte work best on test-fit planning cycles, and where does each approach tend to slow down?
Which provider is better for MEP-first utility integration decisions, and what breaks if ventilation and utility planning lag behind layout?
How do Perkins&Will and The S/L/A/M Collaborative handle the linkage between fume hood placement logic and room planning decisions?
What tradeoffs appear in multi-discipline coordination turnaround for Gensler and HDR when decisions change late in schematic?
How do teams use BIM coordination differently with HOK and Payette during design development to control constructability risks?
Where does data migration show up in laboratory design workflows, and which providers support configuration changes with administrative controls and auditability?
How do service providers handle extensibility of laboratory planning deliverables when the basis of design evolves after early stakeholder review?
What common failure mode appears in laboratory casework and exhaust strategy coordination, and how do Gensler and HOK mitigate it during design development?
Tools reviewed
Primary sources checked during evaluation.
Referenced in the comparison table and product reviews above.
How to Choose the Right Laboratory Design
We separate laboratory design options by how they generate, link, and reuse design outputs as your team iterates. Focus on data integrity and control points like data model clarity, automation hooks, and auditability of revisions.
Reusable design data model
Why it matters
A reusable design data model keeps changes from breaking downstream sheets, schedules, and drawings. For laboratory design, that matters when room layouts, equipment, and utilities move during iteration.
How to check
In a demo, import a small sample project and make one change (move a room or reassign a test space). Check whether schedules, tags, and exported outputs update consistently without manual relinking.
Automation and API hooks
Why it matters
Automation and API hooks let our workflow pull generated layout elements into other tools without copy/paste drift. In laboratory design, that reduces repeated rework when we refine spatial constraints.
How to check
Ask for an example workflow: export a lab layout set and then trigger an automated update from a script or connected process. Confirm what objects are addressable (rooms, zones, equipment instances) and how updates propagate.
Revision history and traceability
Why it matters
Revision history and traceability help us explain why a layout changed and what it impacted. For laboratory design deliverables, that prevents version confusion when multiple stakeholders iterate.
How to check
In the interface, perform two edits that affect labels and one edit that affects spatial placement. Then review the change log/audit view to ensure you can see before/after and the affected deliverables.
Configuration for lab constraints
Why it matters
Configuration for lab constraints matters because laboratory layouts depend on practical rules we keep consistent across projects. If constraints are rigid or hard to express, teams fall back to manual work.
How to check
During the demo, create a few constraints relevant to lab space planning (for example, adjacency preferences, clearance rules, and room-type templates). Verify you can reuse them across multiple rooms and see the tool’s effect on outputs.
Export formats and deliverable mapping
Why it matters
Export formats and deliverable mapping decide whether we can deliver the same intent to stakeholders and downstream tools. In laboratory design, mismatched mapping creates rework at the handoff stage.
How to check
Request exports for at least two deliverables (for example, layout drawings and a schedule-style output). Confirm the exported naming, tags, and room identifiers remain stable after a layout edit.
Red flags
- Edits don’t propagate consistently to schedules and exports
- Automation is mostly copy/paste with no clear object addressing
- Revision history can’t show what changed and where it flowed
Fit by situation
- If we frequently revise room assignments during design reviews, prioritize revision history and traceability.
- If our team needs to connect laboratory layout outputs to other workflows, prioritize automation and API hooks.
- If we reuse project templates across multiple laboratory design efforts, prioritize reusable design data model.
Funding and competing interests
This study was co-funded by several of the vendors assessed in it. No single vendor funded it. Funders could propose the market studied.
They had no role in selecting vendors, setting or weighting criteria, analysing data or drawing conclusions, and they received the same factual-accuracy check as every other vendor assessed.
Market definition, inclusion rules and criteria weights were fixed by an editor before research began and did not change afterwards. Editorial process →
- Service review · 2026 · Construction & InfrastructureLab Design
- Service review · 2026 · Science & ResearchLaboratory Consulting
- Service review · 2026 · Facilities & Property ServicesLaboratory Support
- Review · 2026 · Construction & InfrastructureDesign Construction Software
- Review · 2026 · Facilities & Property ServicesLaboratory Management Software
Keep exploring
Comparing two specific tools?
Software Alternatives
See head-to-head software comparisons with feature breakdowns, pricing, and our recommendation for each use case.
Explore software alternatives→In this category
Construction & Infrastructure alternatives
See side-by-side comparisons of construction & infrastructure tools and pick the right one for your stack.
Compare construction & infrastructure tools→