Data Center Nuclear Industry Statistics

The global nuclear power for data centers market reached USD 3.4 billion in 2026, explore the figures behind growth, contracting companies, and reactor-and-grid trends.
5Statistics
27Sources
1Sections
1Visuals
13mRead
Data Center Nuclear Industry Statistics
How this report is researched
01Editorial Scope

An editor sets the topic, the inclusion criteria, and the evaluation framework before research starts.

02Source Research

AI search agents locate sources and extract each figure together with the document it came from.

Read our full methodology →

Search agents attach provenance to every extracted figure.

Next review: within 44 days

01 Industry overview

The data center nuclear industry at a glance

Data-center nuclear activity is accelerating through long-term power deals and reactor restarts: Google and Constellation announced 890 MW of additional nuclear capacity for the PJM grid in October 2026.

890 MW[4]
Google-Constellation capacity, 2026
11.8%[5]
U.S. electricity share by 2030
25 GW[2]
Announced SMR capacity, 2024
1.8%[6]
U.S. hyperscale electricity use, 2025
Forecast & CAGR
No reliable, standardized market-size CAGR was identified for the data-center nuclear industry. The strongest available forecast is sector electricity demand: Lawrence Berkeley National Laboratory estimates that U.S. data centers could consume 11.8% of national electricity by 2030, compared with modeled 2024 consumption of about 176 TWh.[5]
Market share & regions
The United States is the leading commercial market for data-center nuclear contracting identified in the available sources. In the U.S., 403 hyperscale data centers consumed an estimated 82 TWh between May 2024 and April 2025, equivalent to approximately 1.8% of national electricity consumption; internationally, the IEA identifies the United States as a particularly important market for nuclear supply to data centers, while Japan and Korea together represented about 5% of global data-center electricity demand in 2024.[6][7]
Segmentation
The industry divides into existing-reactor arrangements, including power-purchase agreements, uprates and restarts, and advanced-nuclear projects based on small modular reactors. Examples include Microsoft’s 835-MW Crane restart agreement, Meta’s 1,121-MW Clinton agreement, Amazon’s 190-MW Calvert Cliffs expansion, and Google’s planned 50-MW Kairos deployment, with additional Kairos capacity targeted through 2035.[8][4][9]
Key players & concentration
Demand is concentrated among major hyperscalers and cloud operators, notably Amazon, Google, Meta and Microsoft. Supply is concentrated among large nuclear owners and developers such as Constellation, NextEra, Kairos Power, X-energy and Talen Energy; Google’s October 2026 agreement alone covers 11 Constellation reactor units and 890 MW of incremental capacity.[4][10][8]
Pricing
Public sources generally disclose capacity and contract duration rather than power prices. The disclosed commercial structure is predominantly long-term contracting: Microsoft’s Crane agreement, Meta’s Clinton agreement and Amazon’s Calvert Cliffs agreement each run for 20 years; Amazon’s 2026 Calvert Cliffs agreement includes 690 MW of contracted power and approximately 190 MW of uprated capacity.[8][4]
Trends, drivers & challenges
AI workloads are driving rapid load growth: EPRI estimates that AI represented 15%–25% of data-center electricity use in 2026 and is rising. Nuclear is attractive because it provides firm, low-carbon power, but projects face long development timelines, licensing requirements, transmission constraints and local opposition; the IEA expects the first SMRs serving data-center demand mainly after 2030.[11][7][12]
Consumer behavior & competition
The direct buyers are hyperscalers rather than household consumers, and their procurement is shifting toward firm, 24/7 carbon-free electricity that can support AI growth. Competition is therefore based on reliability, interconnection timing, emissions attributes, contract duration and scalability; Google’s 2025 agreements targeted 50 MW from Kairos and more than 600 MW from the planned Duane Arnold restart, while Amazon’s 2026 X-energy project targets 960 MW.[9][10]
M&A
No reliable evidence of a major merger or acquisition specifically creating a data-center nuclear industry segment was identified. The dominant transaction pattern is commercial contracting and project investment: Amazon purchased the Cumulus data-center campus adjacent to Talen’s Susquehanna plant for $650 million in 2024, while subsequent activity has centered on PPAs, reactor restarts and SMR development agreements.[13][12]
Regulation
U.S. nuclear projects require Nuclear Regulatory Commission licensing, while data-center co-location and power transfers can require Federal Energy Regulatory Commission review. In November 2024, FERC rejected Amazon’s proposed revised arrangement for additional power from Talen’s Susquehanna nuclear plant, illustrating that co-location and grid-reliability issues remain regulatory constraints; NRC rules allow initial and subsequent license renewals of up to 20 years after the initial 40-year term.[12][8]
Latest news
The latest major announcements available by November 18, 2026 include Google and Constellation’s October 6 agreement to unlock 890 MW across 11 nuclear units, and Amazon, X-energy and AEP’s October 19 agreement targeting 960 MW from 12 Xe-100 SMRs in Indiana. Amazon and Constellation also announced a September 30 agreement covering 690 MW at Calvert Cliffs, including approximately 190 MW of new uprated capacity.[4][10]

02 Ranking

Top 10 Companies in the Data Center Nuclear Industry

The leading companies in the data center nuclear industry, ranked on market impact, performance, momentum, innovation and brand popularity.

Updated November 18, 2026 · Next review December 18, 2026

Verdict

Westinghouse Electric Company stands out for reactor technology underpinning a large share of the operating fleet because its technology underpins approximately half of the world’s operating nuclear reactors, while Constellation Energy focuses on nuclear contracting for data centers since it reached an October 2026 agreement for 890 MW across 11 reactor units.

Ranked by Overall score · How we score ↓

Editor's top 3 picks

Where to start, by need.

  1. #1 Overall · Leader in reactor technology

    Westinghouse Electric Company

    US

    Ranked #1 · 9.3 · Reactor technology

    Why we picked it: Its reactor technology footprint connects near-term contracting to a large share of the operating fleet.

  2. Leader in nuclear power & PPAs

    Constellation Energy

    US

    Ranked #2 · 9.1 · Nuclear power & PPAs

    Why we picked it: It pairs nuclear generation with long-term data-center PPA structures, including an October 2026 890 MW agreement.

  3. Leader in SMR development

    GE Vernova

    US

    Ranked #3 · 9.1 · SMR development

    Why we picked it: It supplies large-reactor and BWRX-300 SMR pathways aimed at later delivery for data-center demand.

Pick 1 is the #1 company overall. Picks 2 and 3 are the highest-ranked companies in the top 5 that add a new segment.

Full ranking

Sort by
Top 10 companies in the data center nuclear industry, 2026 – Gitnux ranking
#CompanyOverall ↓Company snapshot
1

Westinghouse Electric Company

Reactor technology · US

9.3
2

Constellation Energy

Nuclear power & PPAs · US

9.1
3

GE Vernova

SMR development · US

9.1
4

Dominion Energy

SMR development · US

9.1
5

EDF

Nuclear power & PPAs · FR

9.1
6

Tennessee Valley Authority

Nuclear utility and advanced-reactor power buyer, US · US

8.7
7

Bruce Power

Nuclear generation and new-build development, Canada · CA

8.7
8

Talen Energy

Nuclear generation and hyperscale power supply, US · US

8.6
9

TerraPower

Advanced reactors and Natrium power plants · US

8.4
10

X-energy

Advanced SMRs and nuclear fuel technology · US

7.6

How we score

  • Impact (30%): scale and weight in the market (revenue, market share, employees, market position).
  • Performance (20%): recent revenue growth and operating margin; an analyst assessment where a company does not publish them.
  • Momentum (20%): growth trajectory and future potential.
  • Innovation (15%): R&D intensity and how technologically advanced the company is.

Popularity (brand search demand, 15%) counts toward Overall but is not published as a column. Overall leaves out what is not known.

Scale Scores are shown on a 7–10 scale with one decimal; bars start at 7.0.

Cadence Recalculated when new figures are published; next review December 18, 2026.

Independence. Rankings are editorially independent. Scores, ranks, picks and the verdict follow the method above; no company can pay to change them.

Cite this ranking

APA

Samuel Norberg. (2026, November 19). Top 10 companies in the data center nuclear industry. In Data Center Nuclear Industry Statistics. Gitnux. https://gitnux.org/data-center-nuclear-industry-statistics/#top-companies

report visual · Comparison

Attributed electricity generation mix of U.S. hyperscale data centers operating between May 2024 and April 2025

fossil-fuel generation holds the largest share at 53.9%.

fossil-fuel generation53.9%
renewable generation25.3%
nuclear generation20.9%
source-verifiedarxiv.org

04 Statistics

Market Intelligence

Market value and announced SMR pipelines provide the clearest 2026 view of contracting for data-center nuclear, with USD 3.4 billion in 2026 and 45 GW announced by end of 2025.

Market size, volume and shipments in the data center nuclear industry

  • USD 3.4 billion was the 2026 global market value for nuclear power supplied to data centers, covering existing-plant restarts, capacity uprates, life-extension offtake and nuclear-fuel supply-chain services.[1]
  • 45 GW was the announced global SMR capacity for data-center operations by the end of 2025, including 25 GW announced by end-2024 and 20 GW added through January 2026.[2]

Forecast growth and shipments in the data center nuclear industry

  • The global nuclear power for data centers market is projected to reach USD 13.6 billion in 2032 from a 2026 base of USD 3.4 billion, implying a 26% CAGR during 2026–2032.[1]
  • 45 GW of SMR capacity was announced globally for data-center operations by the end of 2025, with first commercial SMRs expected to begin operating around 2030.[2]
  • Up to 250 MWe of next-generation nuclear capacity is planned under Equinix’s Netherlands collaboration with ULC-Energy, subject to a future power-purchase agreement.[3]

Key questions about the data center nuclear industry

How big is the nuclear power supplied to data centers market in 2026?
The market reached USD 3.4 billion in 2026 for existing-plant restarts, capacity uprates, life-extension offtake, and nuclear-fuel supply-chain services.
What growth rate is supported by the available forecasts?
The projected market path implies a 26% CAGR during 2026–2032, rising from USD 3.4 billion in 2026 to USD 13.6 billion in 2032.
Which companies lead the data center nuclear industry?
Westinghouse Electric Company stands out for reactor technology underpinning a large share of the operating fleet because its technology underpins approximately half of the world’s operating nuclear reactors, while Constellation Energy focuses on nuclear contracting for data centers since it reached an October 2026 agreement for 890 MW across 11 reactor units.
How is the technology shift playing out for data-center nuclear?
Existing reactors drive near-term supply via restarts and uprates, while advanced-reactor and SMR deliveries are expected mainly after 2030, per IEA expectations.
What is the contracting structure and who buys?
Long-term contracting dominates, with disclosed deals running 20 years for Microsoft’s Crane, Meta’s Clinton, and Amazon’s Calvert Cliffs agreements. The direct buyers are hyperscalers using firm, 24/7 carbon-free power for AI growth.
What regulatory constraints affect projects?
U.S. nuclear projects require Nuclear Regulatory Commission licensing, while data-center co-location and power transfers can require Federal Energy Regulatory Commission review. In November 2024, FERC rejected Amazon’s revised arrangement for additional power from Talen’s Susquehanna plant.
Reference

Cite This Report

This report is designed to be cited. We maintain stable URLs and versioned verification dates. Copy the format appropriate for your publication below.

APA
Samuel Norberg. (2026, November 19). Data Center Nuclear Industry Statistics. Gitnux. https://gitnux.org/data-center-nuclear-industry-statistics
MLA
Samuel Norberg. "Data Center Nuclear Industry Statistics." Gitnux, 19 Nov 2026, https://gitnux.org/data-center-nuclear-industry-statistics.
Chicago
Samuel Norberg. 2026. "Data Center Nuclear Industry Statistics." Gitnux. https://gitnux.org/data-center-nuclear-industry-statistics.