01 Industry overview
The data center nuclear industry at a glance
Data-center nuclear activity is accelerating through long-term power deals and reactor restarts: Google and Constellation announced 890 MW of additional nuclear capacity for the PJM grid in October 2026.
- 890 MW[4]
- Google-Constellation capacity, 2026
- 11.8%[5]
- U.S. electricity share by 2030
- 25 GW[2]
- Announced SMR capacity, 2024
- 1.8%[6]
- U.S. hyperscale electricity use, 2025
- Forecast & CAGR
- No reliable, standardized market-size CAGR was identified for the data-center nuclear industry. The strongest available forecast is sector electricity demand: Lawrence Berkeley National Laboratory estimates that U.S. data centers could consume 11.8% of national electricity by 2030, compared with modeled 2024 consumption of about 176 TWh.[5]
- Market share & regions
- The United States is the leading commercial market for data-center nuclear contracting identified in the available sources. In the U.S., 403 hyperscale data centers consumed an estimated 82 TWh between May 2024 and April 2025, equivalent to approximately 1.8% of national electricity consumption; internationally, the IEA identifies the United States as a particularly important market for nuclear supply to data centers, while Japan and Korea together represented about 5% of global data-center electricity demand in 2024.[6][7]
- Segmentation
- The industry divides into existing-reactor arrangements, including power-purchase agreements, uprates and restarts, and advanced-nuclear projects based on small modular reactors. Examples include Microsoft’s 835-MW Crane restart agreement, Meta’s 1,121-MW Clinton agreement, Amazon’s 190-MW Calvert Cliffs expansion, and Google’s planned 50-MW Kairos deployment, with additional Kairos capacity targeted through 2035.[8][4][9]
- Key players & concentration
- Demand is concentrated among major hyperscalers and cloud operators, notably Amazon, Google, Meta and Microsoft. Supply is concentrated among large nuclear owners and developers such as Constellation, NextEra, Kairos Power, X-energy and Talen Energy; Google’s October 2026 agreement alone covers 11 Constellation reactor units and 890 MW of incremental capacity.[4][10][8]
- Pricing
- Public sources generally disclose capacity and contract duration rather than power prices. The disclosed commercial structure is predominantly long-term contracting: Microsoft’s Crane agreement, Meta’s Clinton agreement and Amazon’s Calvert Cliffs agreement each run for 20 years; Amazon’s 2026 Calvert Cliffs agreement includes 690 MW of contracted power and approximately 190 MW of uprated capacity.[8][4]
- Trends, drivers & challenges
- AI workloads are driving rapid load growth: EPRI estimates that AI represented 15%–25% of data-center electricity use in 2026 and is rising. Nuclear is attractive because it provides firm, low-carbon power, but projects face long development timelines, licensing requirements, transmission constraints and local opposition; the IEA expects the first SMRs serving data-center demand mainly after 2030.[11][7][12]
- Consumer behavior & competition
- The direct buyers are hyperscalers rather than household consumers, and their procurement is shifting toward firm, 24/7 carbon-free electricity that can support AI growth. Competition is therefore based on reliability, interconnection timing, emissions attributes, contract duration and scalability; Google’s 2025 agreements targeted 50 MW from Kairos and more than 600 MW from the planned Duane Arnold restart, while Amazon’s 2026 X-energy project targets 960 MW.[9][10]
- M&A
- No reliable evidence of a major merger or acquisition specifically creating a data-center nuclear industry segment was identified. The dominant transaction pattern is commercial contracting and project investment: Amazon purchased the Cumulus data-center campus adjacent to Talen’s Susquehanna plant for $650 million in 2024, while subsequent activity has centered on PPAs, reactor restarts and SMR development agreements.[13][12]
- Regulation
- U.S. nuclear projects require Nuclear Regulatory Commission licensing, while data-center co-location and power transfers can require Federal Energy Regulatory Commission review. In November 2024, FERC rejected Amazon’s proposed revised arrangement for additional power from Talen’s Susquehanna nuclear plant, illustrating that co-location and grid-reliability issues remain regulatory constraints; NRC rules allow initial and subsequent license renewals of up to 20 years after the initial 40-year term.[12][8]
- Latest news
- The latest major announcements available by November 18, 2026 include Google and Constellation’s October 6 agreement to unlock 890 MW across 11 nuclear units, and Amazon, X-energy and AEP’s October 19 agreement targeting 960 MW from 12 Xe-100 SMRs in Indiana. Amazon and Constellation also announced a September 30 agreement covering 690 MW at Calvert Cliffs, including approximately 190 MW of new uprated capacity.[4][10]
02 Ranking
Top 10 Companies in the Data Center Nuclear Industry
The leading companies in the data center nuclear industry, ranked on market impact, performance, momentum, innovation and brand popularity.
Updated November 18, 2026 · Next review December 18, 2026
Westinghouse Electric Company stands out for reactor technology underpinning a large share of the operating fleet because its technology underpins approximately half of the world’s operating nuclear reactors, while Constellation Energy focuses on nuclear contracting for data centers since it reached an October 2026 agreement for 890 MW across 11 reactor units.
Ranked by Overall score · How we score ↓
Editor's top 3 picks
Where to start, by need.
#1 Overall · Leader in reactor technology
Westinghouse Electric Company
US
Ranked #1 · 9.3 · Reactor technology
Why we picked it: Its reactor technology footprint connects near-term contracting to a large share of the operating fleet.
Leader in nuclear power & PPAs
Constellation Energy
US
Ranked #2 · 9.1 · Nuclear power & PPAs
Why we picked it: It pairs nuclear generation with long-term data-center PPA structures, including an October 2026 890 MW agreement.
Leader in SMR development
GE Vernova
US
Ranked #3 · 9.1 · SMR development
Why we picked it: It supplies large-reactor and BWRX-300 SMR pathways aimed at later delivery for data-center demand.
Pick 1 is the #1 company overall. Picks 2 and 3 are the highest-ranked companies in the top 5 that add a new segment.
Full ranking
| # | Company | Overall ↓ | Impact | Performance | Momentum | Innovation | Company snapshot |
|---|---|---|---|---|---|---|---|
| 1 | Westinghouse Electric Company Reactor technology · US | 9.3 | 9.0 | 9.6 | 9.9 | 8.9 | |
Company snapshot · Westinghouse Electric Company · Data as of November 18, 2026 Westinghouse technology underpins approximately half of the world's operating nuclear reactors.[14]
| |||||||
| 2 | Constellation Energy Nuclear power & PPAs · US | 9.1 | 9.4 | 8.8 | 9.6 | 8.9 | |
Company snapshot · Constellation Energy · Data as of November 18, 2026 Operates the US's largest nuclear fleet and has long-term data-center power deals.[8]
| |||||||
| 3 | GE Vernova SMR development · US | 9.1 | 9.0 | 8.4 | 9.6 | 8.9 | |
Company snapshot · GE Vernova · Data as of November 18, 2026 Its BWRX-300 is under construction at Darlington, North America's first commercial SMR project.[15]
| |||||||
| 4 | Dominion Energy SMR development · US | 9.1 | 9.1 | 9.9 | 9.5 | 8.0 | |
Company snapshot · Dominion Energy · Data as of November 18, 2026 Explored at least 300 MW of SMR capacity near its North Anna nuclear station for Amazon.[16]
| |||||||
| 5 | EDF Nuclear power & PPAs · FR | 9.1 | 9.9 | 9.6 | 8.5 | 8.0 | |
Company snapshot · EDF · Data as of November 18, 2026 Generated 515 TWh in 2025, with nuclear accounting for about 80% of output.[17]
| |||||||
| 6 | Tennessee Valley Authority Nuclear utility and advanced-reactor power buyer, US · US | 8.7 | 8.2 | 9.6 | 9.2 | 8.0 | |
Company snapshot · Tennessee Valley Authority · Data as of November 18, 2026 Signed a PPA to buy power from Kairos's advanced reactor for Google data centers.[13]
| |||||||
| 7 | Bruce Power Nuclear generation and new-build development, Canada · CA | 8.7 | 8.2 | 9.6 | 9.2 | 8.0 | |
Company snapshot · Bruce Power · Data as of November 18, 2026 Operates eight reactors producing approximately 30% of Ontario's electricity.[18]
| |||||||
| 8 | Talen Energy Nuclear generation and hyperscale power supply, US · US | 8.6 | 8.2 | 9.1 | 9.4 | 8.0 | |
Company snapshot · Talen Energy · Data as of November 18, 2026 Owns 90% of the 2.5 GW Susquehanna plant supplying Amazon's data-center campus.[19]
| |||||||
| 9 | TerraPower Advanced reactors and Natrium power plants · US | 8.4 | 7.0 | 8.5 | 9.2 | 9.9 | |
Company snapshot · TerraPower · Data as of November 18, 2026 Agreed with Meta to develop up to eight Natrium plants providing up to 2.8 GW.[20]
| |||||||
| 10 | X-energy Advanced SMRs and nuclear fuel technology · US | 7.6 | 7.0 | 7.1 | 7.1 | 8.9 | |
Company snapshot · X-energy · Data as of November 18, 2026 Amazon backed a potential US deployment of more than 5 GW of X-energy SMRs by 2039.[21]
| |||||||
How we score
- Impact (30%): scale and weight in the market (revenue, market share, employees, market position).
- Performance (20%): recent revenue growth and operating margin; an analyst assessment where a company does not publish them.
- Momentum (20%): growth trajectory and future potential.
- Innovation (15%): R&D intensity and how technologically advanced the company is.
Popularity (brand search demand, 15%) counts toward Overall but is not published as a column. Overall leaves out what is not known.
Scale Scores are shown on a 7–10 scale with one decimal; bars start at 7.0.
Cadence Recalculated when new figures are published; next review December 18, 2026.
Independence. Rankings are editorially independent. Scores, ranks, picks and the verdict follow the method above; no company can pay to change them.
Cite this ranking
APA
Samuel Norberg. (2026, November 19). Top 10 companies in the data center nuclear industry. In Data Center Nuclear Industry Statistics. Gitnux. https://gitnux.org/data-center-nuclear-industry-statistics/#top-companies
Attributed electricity generation mix of U.S. hyperscale data centers operating between May 2024 and April 2025
fossil-fuel generation holds the largest share at 53.9%.
03 Trends & forecasts
Top 10 Data Center Nuclear Industry Trends & Forecasts 2027
What is changing in the data center nuclear industry, with the evidence behind each trend and a forecast for 2027.
Forecasts were generated by an AI model from the cited evidence. They are estimates, not guarantees.
01AI-driven load growth accelerates
High confidenceU.S. data-center electricity consumption is projected to reach 649 TWh in 2030, or 11.8% of national electricity use, while AI servers are expected to account for 55% of total data-center electricity consumption by 2030. Global data-center demand is projected to rise from 485 TWh in 2025 to 950 TWh in 2030.[22][7]
Forecast 2027: In 2027, AI-related load growth will remain the primary demand driver for nuclear contracting. More hyperscalers are likely to secure firm power before new data-center campuses reach full operation.
02Existing reactors lead near-term supply
High confidenceMost current data-center nuclear PPAs involve operating reactors rather than new-build SMRs. Examples include Meta’s 1,121-MW Clinton agreement, Amazon’s 690-MW Calvert Cliffs agreement and Google’s 890-MW agreement covering 11 Constellation units.[4][8]
Forecast 2027: Existing-reactor PPAs, uprates and relicensing will provide most nuclear capacity actually available to data centers in 2027. New SMR projects will continue to build pipelines but will contribute little operating capacity during the year.
03Long-term PPAs become standard
High confidenceGoogle and Constellation signed a 20-year PPA linked to 890 MW of incremental PJM capacity. Amazon and Constellation also signed a 20-year agreement covering 690 MW at Calvert Cliffs, including a 190-MW uprate.[8]
Forecast 2027: Twenty-year contracts will remain the dominant commercial structure in 2027 because they support plant investment, relicensing and capacity uprates. Shorter-term or purely merchant arrangements will remain less common for hyperscale buyers.
04SMR pipelines expand faster than deployment
High confidenceThe IEA reported approximately 45 GW of SMR capacity covered by data-center expressions of interest, memoranda or letters of intent as of January 2026. Google’s Kairos agreement provides a pathway to up to 500 MW by 2035, beginning with a 50-MW deployment planned for 2030.[7][23]
Forecast 2027: The announced SMR pipeline will grow further in 2027, but most projects will remain conditional or pre-construction. Commercial operating SMR capacity dedicated to data centers is unlikely to become material before 2030.
05Uprates unlock incremental capacity
High confidenceGoogle’s 20-year Constellation agreement targets approximately 890 MW of incremental generation through investments across 11 existing units, with the first uprate expected in 2028. Amazon’s Calvert Cliffs agreement includes a 190-MW capacity expansion within a 690-MW contracted arrangement.[4]
Forecast 2027: Uprates and efficiency projects will become a preferred 2027 supply strategy because they can add capacity faster than greenfield reactors. The market will increasingly value projects that expand output without requiring a new reactor site.
06Hyperscaler concentration intensifies
High confidenceThe largest disclosed nuclear-data-center arrangements are concentrated among Amazon, Google and Meta, including Amazon’s 690-MW Calvert Cliffs agreement, Google’s 890-MW PJM agreement and Meta’s 1,121-MW Clinton PPA. Microsoft separately announced an 835-MW PPA supporting the restart of a Pennsylvania facility.[8][4][24]
Forecast 2027: In 2027, procurement will remain concentrated among a small group of hyperscalers with large, creditworthy loads. These buyers will continue to secure capacity through direct PPAs, development funding and strategic partnerships.
07Nuclear suppliers gain bargaining power
Medium confidenceConstellation’s October 2026 Google agreement represents 890 MW across 11 units and more than $4.3 billion of planned investment. X-energy’s Indiana project with Amazon and AEP covers a proposed 12-unit, 960-MW Xe-100 plant.[4][25]
Forecast 2027: In 2027, established nuclear owners and a limited number of advanced-reactor developers will retain strong negotiating positions. Developers with credible licensing, fuel and construction plans will attract the largest share of hyperscaler commitments.
08Firm clean power commands a premium
Medium confidenceThe IEA identifies nuclear as supplying about 15% of the electricity physically consumed by data centers globally in 2024, while renewables supplied about 27% and natural gas 26%. Hyperscaler nuclear contracts emphasize firm, emissions-free generation and long-term reliability rather than only annual energy volumes.[7]
Forecast 2027: Publicly disclosed prices will remain limited in 2027, but firm nuclear power will continue to command strategic value relative to intermittent supply. Contract competition will focus on reliability, delivery timing, emissions attributes and scalability rather than transparent spot pricing.
09Grid-connected structures replace co-location
High confidenceFERC rejected Amazon’s proposed revised arrangement for additional power from Talen’s Susquehanna plant in 2024. Talen and Amazon subsequently agreed that the Susquehanna data-center load would transition from behind-the-meter co-location to a front-of-meter arrangement beginning in spring 2026.[26]
Forecast 2027: In 2027, nuclear-data-center projects will increasingly use standard grid-connected PPAs or retail supply arrangements. Pure behind-the-meter structures will face greater scrutiny over transmission costs, reliability and market impacts.
10Licensing remains the main SMR bottleneck
High confidenceThe IEA expects nuclear to become increasingly important for data-center demand toward the end of the decade, with first SMRs serving data centers mainly after 2030. Google’s first Kairos deployment is scheduled for 2030, while the NRC must license commercial reactors and review advanced designs and construction applications.[7][9][27]
Forecast 2027: Regulatory milestones will remain more important than headline capacity announcements in 2027. Projects that reach formal NRC applications, construction permits or approved designs will separate themselves from speculative SMR pipelines.
04 Statistics
Market Intelligence
Market value and announced SMR pipelines provide the clearest 2026 view of contracting for data-center nuclear, with USD 3.4 billion in 2026 and 45 GW announced by end of 2025.
Market size, volume and shipments in the data center nuclear industry
- USD 3.4 billion was the 2026 global market value for nuclear power supplied to data centers, covering existing-plant restarts, capacity uprates, life-extension offtake and nuclear-fuel supply-chain services.[1]
- 45 GW was the announced global SMR capacity for data-center operations by the end of 2025, including 25 GW announced by end-2024 and 20 GW added through January 2026.[2]
Forecast growth and shipments in the data center nuclear industry
- The global nuclear power for data centers market is projected to reach USD 13.6 billion in 2032 from a 2026 base of USD 3.4 billion, implying a 26% CAGR during 2026–2032.[1]
- 45 GW of SMR capacity was announced globally for data-center operations by the end of 2025, with first commercial SMRs expected to begin operating around 2030.[2]
- Up to 250 MWe of next-generation nuclear capacity is planned under Equinix’s Netherlands collaboration with ULC-Energy, subject to a future power-purchase agreement.[3]
Key questions about the data center nuclear industry
How big is the nuclear power supplied to data centers market in 2026?
What growth rate is supported by the available forecasts?
Which companies lead the data center nuclear industry?
How is the technology shift playing out for data-center nuclear?
What is the contracting structure and who buys?
What regulatory constraints affect projects?
Cite This Report
This report is designed to be cited. We maintain stable URLs and versioned verification dates. Copy the format appropriate for your publication below.
Samuel Norberg. (2026, November 19). Data Center Nuclear Industry Statistics. Gitnux. https://gitnux.org/data-center-nuclear-industry-statistics
Samuel Norberg. "Data Center Nuclear Industry Statistics." Gitnux, 19 Nov 2026, https://gitnux.org/data-center-nuclear-industry-statistics.
Samuel Norberg. 2026. "Data Center Nuclear Industry Statistics." Gitnux. https://gitnux.org/data-center-nuclear-industry-statistics.
Sources & references
27 sources cited across this report
marketsandmarkets.com
iea.blob.core.windows.net
newsroom.equinix.com
investors.constellationenergy.com
escholarship.org
arxiv.org
iea.org
constellationenergy.com
blog.google
aboutamazon.com
powering-intelligence.epri.com
congress.gov
apnews.com
westinghousenuclear.com
gevernova.com
worldnuclearreport.org
edf.fr
brucepower.com
ir.talenenergy.com
terrapower.com
x-energy.com
eta.lbl.gov
kairospower.com
microsoft.com
investors.x-energy.com
ferc.gov
nrc.gov
