Top 10 Best Diesel Generator Sizing Software of 2026

GITNUXSOFTWARE REVIEW

General Knowledge

Top 10 Best Diesel Generator Sizing Software of 2026

Compare options in diesel generator sizing software, including MTU Onsite Energy PowerCalc, for diesel generator planning and load calculations.

22 min readUpdated Editorially scoped research
How we ranked these tools
01Editorial Scope

Vendors set the topic, but our editors set the inclusion criteria and the evaluation framework before research starts.

02Source Research

Search agents gather the source set and the review record, including transcriptions of video reviews and podcasts.

Read our full methodology →

Framework: Features 40% · Ease 30% · Value 30%

Gitnux may earn a commission through links on this page. This does not influence our reviews. Editorial policy

Diesel generator sizing software tools model generator and load behavior so engineers can select alternator ratings, engine setpoints, and starting conditions that match site requirements. This comparison helps technical evaluators weigh load modeling depth, configuration workflows, and reporting outputs to avoid under-sized standby systems and audit gaps in design documentation.

MTU Onsite Energy PowerCalc is the best pick for MTU-aligned teams because its configuration-aware workflow ties your generator sizing to MTU setup assumptions early, while Cummins Power Suite is the better alternative when you need Cummins-specific set selection outputs with fewer spreadsheet handoffs.

Editor’s top 3 picks

Three quick recommendations before you dive into the full comparison below — each one leads on a different dimension.

Editor pick
1

MTU Onsite Energy PowerCalc

MTU configuration-aware sizing workflow ties generator outputs to MTU engine and setup assumptions rather than only load math.

Best for: Fits when MTU-aligned generator sizing needs repeatable concept-design outputs and duty-based assumptions.

2

Generac Industrial Power Design Pro

Editor pick

Generator recommendation output that couples sizing results with Generac set selection inputs and formatted worksheets.

Best for: Fits when teams must repeat diesel sizing plus Generac set selection with documented assumptions.

3

ETAP

Editor pick

Generator set selection is driven by ETAP’s electrical network model, keeping downstream studies aligned without rebuilding assumptions.

Best for: Fits when diesel generator sizing must stay consistent with protection, fault studies, and single-line deliverables.

Comparison Table

1
enterprise
9.5/10
Overall
2
8.7/10
Overall
3
enterprise
8.6/10
Overall
4
enterprise
8.5/10
Overall
5
enterprise
8.0/10
Overall
6
7.8/10
Overall
7
vertical specialist
7.4/10
Overall
8
7.2/10
Overall
9
vertical specialist
6.8/10
Overall
10
vertical specialist
6.6/10
Overall
#1

MTU Onsite Energy PowerCalc

enterprise

Manufacturer-provided power generation sizing and configuration tool for onsite energy systems.

9.5/10
Overall
Features9.5/10
Ease of Use9.5/10
Value9.5/10
Standout feature

MTU configuration-aware sizing workflow ties generator outputs to MTU engine and setup assumptions rather than only load math.

PowerCalc is a sizing workflow for diesel generator sets where engine and alternator configuration inputs influence the resulting selection outputs. It helps engineers move from load lists and operating conditions into generator set sizing results used for preliminary selection packages. The tool’s strongest fit is when the project expects MTU-specific configuration constraints to be reflected early. A common output pattern is repeatable sizing for multiple operating scenarios so teams can compare candidates side by side.

A key tradeoff is that the tool centers on MTU Onsite Energy configuration assumptions, so it is less ideal for vendor-neutral sizing across arbitrary alternator and engine catalogs. It works well when a project team needs quick iteration during concept design or when preparing a generator set selection worksheet for early stakeholder review. In cases requiring deep fault analysis, harmonic spectrum modeling, or detailed step load transient simulation, PowerCalc is typically not the only calculation layer needed.

Pros
  • +Engine-aligned sizing inputs support MTU configuration constraints early
  • +Scenario iteration supports comparing multiple operating profiles quickly
  • +Duty-focused workflow fits preliminary generator set selection processes
  • +Structured inputs reduce manual calculation errors for load assumptions
Cons
  • –Vendor-neutral sizing across non-MTU engine and alternator options is limited
  • –Deep transient and network fault studies require separate analysis tools
  • –Advanced electrical modeling depends on the completeness of entered load data
  • –Exports are useful for review packets but may not meet custom worksheet standards
Use scenarios
  • Generator selection engineers

    Concept design sizing from load lists

    Faster preliminary candidate selection

  • Emergency power project teams

    Standby generator duty determination

    Consistent standby sizing package

Show 1 more scenario
  • Facilities engineering leads

    Scenario comparison during procurement planning

    Reduced rework later

    Compares multiple operating profiles to narrow the generator set selection before detailed studies begin.

Best for: Fits when MTU-aligned generator sizing needs repeatable concept-design outputs and duty-based assumptions.

#2

Generac Industrial Power Design Pro

enterprise

Generator sizing and specification software for industrial backup power system design.

8.7/10
Overall
Features8.7/10
Ease of Use8.7/10
Value8.7/10
Standout feature

Generator recommendation output that couples sizing results with Generac set selection inputs and formatted worksheets.

Generac Industrial Power Design Pro is designed around generator sizing tasks that start from a load list and end at a generator set recommendation with documented assumptions. The workflow supports typical standby and prime design steps such as setting operational mode, applying power factor and motor starting loads from the entered load data, and selecting a matching kW and kVA basis. Output materials focus on engineer review rather than consumer-style estimates, with figures formatted for internal submittals and checklist verification.

A key tradeoff is that sizing quality is tied to how precisely the entered load list captures starting loads, duty context, and voltage and phase details. It fits best when an electrical engineer or sales engineer repeatedly sizes projects against a consistent internal standards set and wants fewer spreadsheet-to-quote conversions. It is less efficient for early-stage screening when the project team only has vague load ranges, because the inputs still need to be specific enough to drive set selection.

Pros
  • +Generator recommendation output links calculation results to Generac equipment selection
  • +Load list driven workflow matches common sizing handoff needs for design documentation
  • +Worksheet-style results make assumptions easy to check during review cycles
  • +Supports motor starting load inclusion based on entered electrical parameters
Cons
  • –Requires detailed load and starting data to avoid weak sizing accuracy
  • –Less suited to early screening when loads are still ranges and estimates
Use scenarios
  • Generac sales engineering teams

    Quote-ready generator sizing from load lists

    Fewer manual spreadsheet handoffs

  • Electrical design engineers

    Design documentation for generator selection

    Faster internal review cycles

Show 1 more scenario
  • Standby power project managers

    Repeatable sizing across similar sites

    More consistent sizing outcomes

    Standardizes generator selection inputs so similar projects produce consistent sizing outputs.

Best for: Fits when teams must repeat diesel sizing plus Generac set selection with documented assumptions.

#3

ETAP

enterprise

Power system simulation software with generator sizing and load analysis modules.

8.6/10
Overall
Features8.6/10
Ease of Use8.6/10
Value8.6/10
Standout feature

Generator set selection is driven by ETAP’s electrical network model, keeping downstream studies aligned without rebuilding assumptions.

ETAP provides diesel generator sizing inside a wider ETAP electrical design workflow that includes system modeling, protection checks, and single-line study artifacts. Generator set selection supports rating and operating scenarios tied to modeled electrical loads, with outputs geared toward engineering review rather than standalone calculator results.

ETAP’s distinct value is connecting generator sizing inputs to the same project data used for downstream studies like load flow, short-circuit, and protective relay coordination. That integration reduces manual re-entry when sizing is revisited after load, voltage, or protection assumptions change.

Pros
  • +Generator sizing uses the same electrical network model as load flow studies
  • +Exports generator set selection artifacts consistent with ETAP single-line documentation
  • +Supports iterative sizing as protection and network assumptions change in one project
  • +Integrates generator studies with short-circuit and protection workflows
Cons
  • –Sizing accuracy depends on how well the overall network and load model is built
  • –Heavier project setup than formula-only calculators for quick one-off estimates
Use scenarios
  • Electrical distribution designers

    Size diesel sets against feeder loads

    Equipment selections validated against loads

  • Industrial plant electrical engineers

    Assess generator impacts during expansion

    Change proposals tied to studies

Show 1 more scenario
  • Electrical safety specialists

    Support arc-flash safety assumptions

    Safety outputs tied to network model

    Connect generator sizing inputs to fault and protective-device scenarios used in safety analysis.

Best for: Fits when diesel generator sizing must stay consistent with protection, fault studies, and single-line deliverables.

#4

EasyPower

enterprise

Electrical power system design and analysis software with generator sizing and backup power study capabilities.

8.5/10
Overall
Features8.5/10
Ease of Use8.5/10
Value8.5/10
Standout feature

Step-by-step load pickup simulation ties generator electrical performance back to the modeled event sequence.

EasyPower is engineered for recurring generator studies where loads, motor starting, and operating profiles need repeatable configuration across multiple set options. The tool can simulate load pickup steps and evaluate voltage response during events that commonly drive generator oversizing decisions. Output artifacts include engineer-readable worksheets and report exports that align with typical submittal workflows.

Pros
  • +Load and generator sizing outputs stay linked to modeled electrical assumptions
  • +Motor starting behavior is included in the sizing workflow
  • +Step load pickup analysis supports event-driven generator selection
  • +Reports and single-line exports reduce manual rework
Cons
  • –Correct inputs for load duty and starting conditions require domain diligence
  • –Automation depends more on repeatable study setup than on full API integration
  • –Complex sites can require multiple iterations to converge on final settings
  • –Workflows for harmonic and fault studies are less central than sizing and transient response
Use scenarios
  • Consulting electrical engineers

    Generator sizing for hospital transfer systems

    Reduced oversizing risk

  • Industrial controls teams

    Sizing for sequenced equipment startup

    Clear startup feasibility

Show 1 more scenario
  • Facilities engineering

    Repeat generator studies across sites

    Faster proposal turnarounds

    Reuses consistent study templates and input sets to generate comparable sizing reports.

Best for: Fits when engineers need repeatable diesel generator sizing studies with exportable outputs.

#5

SKM Power Tools

enterprise

Electrical power system analysis software supporting generator sizing and dynamic stability studies.

8.0/10
Overall
Features8.0/10
Ease of Use8.0/10
Value8.0/10
Standout feature

Schematic-linked generator sizing that stays consistent with SKM project configuration for study-ready handoff.

SKM Power Tools provides diesel generator sizing from schematic-driven system data, which is a distinct workflow versus form-based calculators. Its generator selection output ties into electrical modeling in SKM’s ecosystem, including unit ratings and protection study handoff for coordinated design review.

Pros
  • +Sizing uses model inputs from SKM electrical system data, reducing manual re-entry
  • +Exports consistent generator set selection worksheets that match single-line configuration
  • +Supports iteration loops that update generator ratings after circuit changes
  • +Integrates with SKM study workflows for protection coordination review
Cons
  • –Requires an SKM project workflow, so it is harder to use as a standalone calculator
  • –Transient and load-sequence modeling depth depends on linked study modules
  • –Automation and API access are not described as a primary sizing interface
  • –Handoffs can require manual review when switching standby to prime assumptions
Use scenarios
  • Facility engineers

    Select generator for connected loads

    Generator rating inputs linked to studies

  • Protection coordination engineers

    Coordinate relay behavior with sizing

    More consistent coordination reviews

Show 1 more scenario
  • Grounding engineers

    Relate grounding checks to fault levels

    Grounding design review-ready outputs

    Use SKM network modeling to connect generator sizing contexts with fault-current distribution for grounding design.

Best for: Fits when teams already model power systems in SKM and need generator sizing tied to protection studies.

#6

Digsilent PowerFactory

enterprise

Integrated power system analysis platform with generator sizing and protection modules.

7.8/10
Overall
Features7.8/10
Ease of Use7.7/10
Value7.9/10
Standout feature

Model-driven generator performance checks that reuse the same network for stability and fault studies, then carry results into relay coordination.

Digsilent PowerFactory is an engineering-grade power-system modeling tool that can support diesel generator sizing through detailed electromechanical and network studies. It covers load flow, short-circuit, and stability workflows, so generator voltage regulation, fault contribution, and transient behavior can be evaluated with consistent grid models.

Pros
  • +Uses one consistent network model across load flow, faults, and stability studies
  • +Supports generator reactance modeling tied to voltage and fault calculations
  • +Enables protective relay coordination using the same short-circuit results
  • +Exports single-line diagram representations for review and handoff
Cons
  • –Sizing outputs depend on detailed model build effort and parameter sourcing
  • –Diesel generator fuel consumption curve and fuel sizing workflows are not native generator sizing centers
  • –Transient voltage dip and frequency droop checks require careful study setup
  • –Automation and API surfaces need governance discipline for repeatable model provisioning
Use scenarios
  • Electrical design engineers

    Link generator sizing to cable faults

    Cable decisions tied to generator model

  • System operators and planners

    Compare diesel performance across scenarios

    Scenario comparisons across operating modes

Show 1 more scenario
  • Industrial plant engineering teams

    Produce traceable sizing for complex plants

    Traceable design studies for review

    Represent plant networks and equipment to generate generator sizing outputs tied to fault and protection studies.

Best for: Fits when projects need power-system studies that turn diesel generator sizing into network-wide electrical verification.

#7

Cummins Power Suite

vertical specialist

Generator set specification and project sizing software for standby and prime power applications.

7.4/10
Overall
Features7.4/10
Ease of Use7.4/10
Value7.4/10
Standout feature

Cummins-specific equipment configuration linkage that keeps sizing assumptions aligned with the targeted set build and its documentation outputs.

Cummins Power Suite is a generator sizing workflow built around Cummins engine and generator-set data, with calculations that align equipment selection to electrical loading expectations. The software supports workload interpretation for standby and prime use cases, including load step behavior and operating conditions used in set rating and selection worksheets.

Pros
  • +Tight coupling to Cummins set configuration inputs reduces cross-checking gaps
  • +Produces consistent selection reports suited for generator set selection worksheets
  • +Handles standby and prime rating contexts with condition-based inputs
  • +Exports electrical documentation artifacts to limit manual data entry
Cons
  • –Best results depend on using Cummins catalog data for equipment sizing inputs
  • –Load analysis depth is limited compared with tools focused on IEEE 446 studies
  • –Transient and power quality modeling is less granular for harmonic-heavy designs
  • –Requires careful input governance to avoid mismatched operating and ambient assumptions
Use scenarios
  • Generator project engineers

    Sizing standby generator for facility expansion

    Fewer manual sizing iterations

  • Electrical design coordinators

    Preparing switchgear and controls interface docs

    Reduced transcription during coordination

Show 2 more scenarios
  • Plant operations planners

    Validating prime power operating conditions

    More defensible operating assumptions

    Workload interpretation uses standby and prime assumptions plus load step behavior for set worksheets.

  • Specification and procurement teams

    Aligning procurement specs with Cummins catalogs

    Lower mismatch risk in specs

    End-to-end configuration inputs keep outputs consistent with Cummins equipment selection data models.

Best for: Fits when teams standardize on Cummins generator hardware and need repeatable selection outputs with fewer spreadsheet transfers.

#8

Electrical Power Systems Design (ETPS)

enterprise

Power system analysis software with dedicated generator sizing and load modeling modules.

7.2/10
Overall
Features7.2/10
Ease of Use7.3/10
Value7.1/10
Standout feature

Generator sizing outputs are formatted as engineering artifacts that remain consistent across load assumption revisions.

Electrical Power Systems Design (ETPS) performs diesel generator sizing by combining load modeling inputs with generator set selection outputs that engineers can place into project worksheets and single-line documentation workflows. The software supports common standby and prime sizing approaches and can generate outputs tied to machine selection decisions like alternator capacity and protective setpoints.

Pros
  • +Repeatable calculation runs for generator set sizing revisions
  • +Outputs align to equipment selection decisions like alternator capacity
  • +Works well for standardized worksheets used across similar projects
  • +Supports both standby and prime rating workflows in one tool
Cons
  • –Requires disciplined input setup to maintain consistent sizing results
  • –Limited fit for teams needing API-led integration with external models
  • –Transient and fault studies require separate workflows beyond sizing
  • –UI navigation can feel calculation-centric rather than project-centric
Use scenarios
  • Consulting electrical engineers

    Standby generator sizing for hospitals

    Consistent sizing across revisions

  • Industrial power designers

    Prime power sizing for data centers

    Faster equipment shortlisting

Show 2 more scenarios
  • Facilities engineering teams

    Generator replacement sizing audits

    Reduced rework and change cycles

    ETPS helps compare machine selection impacts against updated load assumptions for replacement projects.

  • Electrical project leads

    Single-line documentation integration

    Audit-ready design records

    Generator selection decisions feed into project worksheets and single-line documentation workflows for approvals.

Best for: Fits when engineering teams need repeatable diesel generator sizing worksheets tied to equipment selection decisions.

#9

PRAMAC Power Design Tools

vertical specialist

Product selection and sizing resources for standby and prime power generator applications.

6.8/10
Overall
Features6.8/10
Ease of Use6.8/10
Value6.8/10
Standout feature

Generator set selection worksheet and single-line diagram export generated from PRAMAC configuration-driven sizing inputs.

PRAMAC Power Design Tools performs diesel generator sizing and set selection workflows that translate electrical load inputs into generator configuration outputs. It supports mapping generator operating modes to selection outputs, then applies duty-related assumptions to drive the selected kW and kVA sizing results.

Pros
  • +Generator selection outputs tie directly to PRAMAC set configuration constraints.
  • +Single-line diagram export supports faster engineering handoff.
  • +Duty-related operating mode inputs flow into sizing results.
  • +Worksheet-style documentation is ready for internal review cycles.
Cons
  • –Limited visibility into underlying electrical transient and fault math steps.
  • –Less suitable for custom alternator models outside PRAMAC component catalog.
Use scenarios
  • Electrical engineers at EPC firms

    Sizing standby diesel sets for hospitals

    Issuable generator selection worksheets

  • Project engineers for data centers

    Selecting generators for UPS bypass loads

    Consistent capacity across teams

Show 2 more scenarios
  • Commissioning and panel engineering teams

    Producing single-line exports for integration

    Faster system integration

    Exports documentation artifacts that support commissioning planning and panel engineering coordination.

  • Industrial facility maintenance planners

    Re-sizing generators during load changes

    Updated set capacity decisions

    Recalculates generator capacity and selection outputs after updated electrical demand inputs.

Best for: Fits when teams need PRAMAC-aligned diesel generator set selection artifacts with engineering handoff outputs.

#10

Himoinsa Sizing Software

vertical specialist

Generator set selection and sizing software for industrial and commercial power applications.

6.6/10
Overall
Features6.6/10
Ease of Use6.6/10
Value6.6/10
Standout feature

Duty-case generator selection workflow that keeps standby versus prime assumptions explicit across the calculation set.

Himoinsa Sizing Software is a diesel generator sizing tool from Himoinsa that focuses on producing generator set selection results from electrical load inputs. Its main workflow centers on translating kW and kVA demands into generator sizing outputs with configuration options for real-world operating constraints.

Pros
  • +Duty-case oriented sizing flow for standby versus prime comparisons
  • +Generator set selection outputs that reduce manual spreadsheet translation
  • +Configuration inputs support practical operating constraints for site conditions
  • +Handover-ready calculation structure for internal review cycles
Cons
  • –Transient and harmonic modeling depth is limited compared with specialized analyzers
  • –External integration and API automation are not clearly exposed for bulk workflows
  • –Load step sequencing checks are not as detailed as enterprise power simulation tools
  • –Complex modeling often requires tight input governance to avoid misleading results
Use scenarios
  • Generator engineering teams

    Size standby diesel sets from load profiles

    Repeatable sizing worksheets for review

  • Plant electrical designers

    Select prime-duty generators for facilities

    Documented generator configuration outputs

Show 2 more scenarios
  • Consulting power system analysts

    Compare kW versus kVA sizing assumptions

    Faster client-ready calculation packs

    Helps translate electrical demand inputs into standardized generator sizing outputs for handoff.

  • Facilities maintenance engineers

    Recheck generator sizing during upgrades

    Lower rework during scope changes

    Supports updated demand inputs to rescope diesel generator requirements with consistent worksheet structure.

Best for: Fits when teams need consistent diesel generator sizing outputs for standby or prime duty with repeatable internal review.

Conclusion

After evaluating 10 diesel generator sizing software, MTU Onsite Energy PowerCalc stands out as our overall top pick — it scored highest across our combined criteria of features, ease of use, and value, which is why it sits at #1 in the rankings above.

Our Top Pick
MTU Onsite Energy PowerCalc

Use the comparison table and detailed reviews above to validate the fit against your own requirements before committing to a tool.

Frequently Asked Questions About Diesel Generator Sizing Software

How does EasyPower model step load pickup compared with ETAP’s generator sizing inside a system study?
EasyPower simulates generator electrical performance tied to the modeled load event sequence, including step load pickup behavior tied back to transfer and response outputs. ETAP drives sizing from the same electrical network model used for load flow, fault, and protective relay checks, so the generator selection stays aligned with downstream studies without re-entering assumptions.
Which tool couples generator sizing with vendor equipment selection inputs rather than treating sizing as a standalone calculator?
Generac Industrial Power Design Pro links generator recommendation outputs to Generac equipment configuration inputs, so the worksheet carries both the electrical sizing results and the target set build. Cummins Power Suite applies a similar end-to-end linkage by using Cummins engine and generator-set data as part of the selection workflow rather than only load math.
How does MTU Onsite Energy PowerCalc handle duty class assumptions for standby versus continuous use cases?
MTU Onsite Energy PowerCalc focuses on duty-focused calculations and uses structured inputs for loads, operating profile, and installation conditions to produce sizing outputs tied to standby or continuous application behavior. That workflow emphasizes engine and setup assumptions that affect the sizing result, not just kW and kVA demand.
What breaks if generator sizing is updated after load changes but protective studies are not linked to the sizing project model?
In ETAP, generator set selection driven by the electrical network model keeps load flow, short-circuit, and protective relay coordination aligned when assumptions change. In a calculator-only workflow like many standalone sizing uses, generator sizing revisions can drift from fault contribution and relay coordination because the electrical study model is not automatically updated from the same input set.
When do SKM Power Tools’ schematic-driven sizing workflows matter for handoff to protection studies?
SKM Power Tools ties generator sizing to SKM project configuration so generator selection stays consistent with unit ratings and protection study handoff. This matters when single-line updates and coordinated design review depend on staying synchronized with the schematic and study artifacts inside the SKM ecosystem.
Which tool produces single-line diagram export artifacts directly from generator selection inputs?
PRAMAC Power Design Tools generates documentation artifacts including generator set selection worksheets and single-line diagram exports from PRAMAC configuration-driven sizing inputs. EasyPower also produces drawings and reports for engineering review use, but PRAMAC’s workflow explicitly generates handoff-ready single-line exports tied to its generator selection context.
How does Digsilent PowerFactory turn generator sizing into network-wide verification beyond steady-state equations?
Digsilent PowerFactory supports load flow, short-circuit, and stability workflows that can evaluate diesel generator voltage regulation, fault contribution, and transient behavior using consistent network models. It also models alternator and generator reactance and carries those results into protective relay coordination, so generator performance checks reuse the same network for multiple study types.
How should teams plan data migration when moving between sizing tools that use different input structures and export formats?
ETPS centers generator sizing as engineering artifacts built from repeatable calculation runs using defined input sets, which reduces rework when revising load assumptions across iterations. ETAP, SKM Power Tools, and Digsilent PowerFactory additionally rely on project-level electrical models, so migration must map load assumptions and equipment configuration into the target data model and schema to preserve study alignment.
What security and access-control expectations differ between tools that operate as standalone sizing calculators and those embedded in multi-user electrical design projects?
Standalone sizing outputs like EasyPower and Electrical Power Systems Design support engineering review exports, but access control typically depends on the file-based workflow around those outputs. Multi-user project modeling in ETAP, SKM Power Tools, and Digsilent PowerFactory usually requires role-based access control and audit logging around project data changes, because generator sizing inputs affect downstream load flow, fault, and relay coordination artifacts.

Tools reviewed

Primary sources checked during evaluation.

Referenced in the comparison table and product reviews above.

How to Choose the Right Diesel Generator Sizing Software

We separate tools by how they handle diesel generator sizing inputs and turn them into an output you can trust under real loads. The differences show up most in engine/load rating logic, assumptions transparency, and the automation path from your load list to a repeatable result.

Rating logic for standby, prime, continuous

Why it matters

Rating logic for standby, prime, continuous controls whether the tool matches how your site actually runs the generator. If the output mixes ratings incorrectly, your kVA margin may look fine on paper but fail in practice.

How to check

During the demo, enter the same load profile and compare outputs while switching the rating basis. Ask which rating definitions it uses and where that choice appears in the calculation summary.

Load list template and input mapping

Why it matters

Load list template and input mapping matters because sizing is only as good as the itemization behind it. A tool that forces you into vague fields increases the chance of missing motors, controls, or intermittent loads.

How to check

Request a sample load-list template and try adding at least one motor load plus non-motor loads. Confirm whether fields support power factor, starting behavior, and duty/usage notes in a way the tool keeps consistent.

Motor starting and transient method coverage

Why it matters

Motor starting and transient method coverage determines whether the tool captures startup kVA impacts and time-sensitive behavior that affect generator sizing. Missing or oversimplified treatment can understate peak demand.

How to check

Add a motor with starting characteristics and a control/induction load, then run sizing. Ask the tool to show how it estimates starting impact and what assumptions drive the transient peak.

Ambient and altitude derating controls

Why it matters

Ambient and altitude derating controls keep the output realistic when conditions deviate from standard test assumptions. Without clear derating inputs, you may oversize or undersize based on site location.

How to check

Change ambient temperature and altitude (or equivalent site fields) and re-run. Verify the output includes a calculation note showing which derating terms were applied.

Calculation trace with exportable report

Why it matters

Calculation trace with exportable report makes it easier to audit assumptions and reproduce results later. When teams must defend the sizing, a clear trace reduces back-and-forth and hidden logic.

How to check

Run a sizing and export the report. Check whether it lists the load assumptions, chosen rating basis, applied factors, and step-by-step totals you can review line by line.

API and automation for repeatable sizing runs

Why it matters

API and automation for repeatable sizing runs matter when the same methodology gets applied across projects. A tool without a clear automation surface pushes teams back into manual re-entry and inconsistent outputs.

How to check

Ask for an API or import/export workflow: submit a load list file and fetch results programmatically. Confirm you can version configuration and reproduce the same run inputs in a repeatable way.

Red flags

  • The output changes rating basis without showing what it used
  • You can’t enter motor start details without the tool dropping them
  • The report doesn’t provide an assumption trace you can audit

Fit by situation

  • If you need to compare different rating bases for the same load set, prioritize Rating logic for standby, prime, continuous.
  • If your team repeatedly sizes projects from structured load lists, prioritize Load list template and input mapping.
  • If you must run sizing in an automated workflow with consistent assumptions, prioritize API and automation for repeatable sizing runs.
Commissioned Research

Funding and competing interests

This study was co-funded by several of the vendors assessed in it. No single vendor funded it. Funders could propose the market studied.

They had no role in selecting vendors, setting or weighting criteria, analysing data or drawing conclusions, and they received the same factual-accuracy check as every other vendor assessed.

Market definition, inclusion rules and criteria weights were fixed by an editor before research began and did not change afterwards. Editorial process →

Keep exploring

FOR SOFTWARE VENDORS

Not on this list? Let’s fix that.

Our best-of pages are how many teams discover and compare tools in this space. If you think your product belongs in this lineup, we’d like to hear from you—we’ll walk you through fit and what an editorial entry looks like.

Apply for a Listing

WHAT THIS INCLUDES

  • Where buyers compare

    Readers come to these pages to shortlist software—your product shows up in that moment, not in a random sidebar.

  • Editorial write-up

    We describe your product in our own words and check the facts before anything goes live.

  • On-page brand presence

    You appear in the roundup the same way as other tools we cover: name, positioning, and a clear next step for readers who want to learn more.

  • Kept up to date

    We refresh lists on a regular rhythm so the category page stays useful as products and pricing change.