Gitnux/Report 2026

Atomic Energy Industry Statistics

The global nuclear generation record was 2,702 TWh in 2025, explore the figures behind growth, companies, and the 78 GW under-construction pipeline.
224Statistics
70Sources
11Sections
1Visuals
42mRead
Atomic Energy Industry Statistics
How this report is researched
01Editorial Scope

An editor sets the topic, the inclusion criteria, and the evaluation framework before research starts.

02Source Research

AI search agents locate sources and extract each figure together with the document it came from.

Read our full methodology →

Search agents attach provenance to every extracted figure.

Next review: within 31 days

01 Industry overview

The atomic energy industry at a glance

Global nuclear generation reached a record 2,702 TWh in 2025, supplying about 9% of world electricity as capacity held near 420 GW and construction accelerated, particularly in China.

2,702 TWh[21]
Global generation, 2025
420 GW[54]
Global capacity, 2025
83.7%[21]
Average capacity factor, 2025
78 GW[54]
Capacity under construction, 2025
Forecast & CAGR
The World Nuclear Association projects global nuclear capacity could reach 1,457 GWe by 2050, compared with about 420 GW at the end of 2025. This implies an approximate 5.1% compound annual growth rate for capacity from 2025 to 2050, calculated from the published figures.[21][54]
Market share & regions
Nuclear supplied about 9% of global electricity in 2025. Growth was led by Asia, while generation was broadly stable in the Americas and Africa and declined in Western and Central Europe; China accounted for half of the 78 GW of capacity under construction.[21][54]
Segmentation
The industry is segmented primarily into large conventional reactors and small modular or advanced reactors. More than 70% of operable reactors are pressurized-water reactors, while nearly all reactors under construction are large-scale units above 1,000 MW; commercial SMR deployment remains limited.[21][54]
Key players & concentration
China is the leading growth market, with half of global nuclear capacity under construction at the end of 2025. Over the past decade, 94% of reactors that started construction used Chinese or Russian designs, indicating strong concentration in new-build technology supply.[54]
Trends, drivers & challenges
Demand is being supported by decarbonization, energy security and rising electricity consumption, while nuclear projects face high capital requirements, long construction periods, technical complexity and cost-overrun risk. Fuel supply is another constraint: the World Nuclear Association warns that uranium mining, conversion, enrichment and fabrication must expand substantially to support future capacity growth.[54][21]
Consumer behavior & competition
Nuclear is primarily an electricity-generation industry rather than a direct consumer market. In the United States, nuclear supplied about 18% of utility-scale electricity generation in 2025, while globally 14 countries generated at least one-quarter of their electricity from nuclear power, reflecting competition with gas, renewables and coal for reliable low-carbon supply.[66][21]
M&A
Recent transactions show consolidation in nuclear services, manufacturing and fuel logistics. BWX Technologies acquired Precision Components Group on July 1, 2026, while Nano Nuclear Energy acquired Secured Transportation Services for $13 million in 2026; the latter reported $7.1 million of 2025 revenue before acquisition.[67][68]
Regulation
Nuclear power remains governed through national licensing systems and international safety obligations. The Convention on Nuclear Safety applies to nuclear installations and requires contracting parties to implement measures through national law; advanced-reactor developers also face licensing and authorization requirements before commercial deployment.[15][67]
Latest news
The World Nuclear Association’s 2026 outlook reported record global nuclear generation of 2,702 TWh in 2025 and an average capacity factor of 83.7%. It also reported 11 reactor construction starts in 2025, including nine in China and two in Russia, and projected that global capacity could reach 1,457 GWe by 2050.[21]

02 Ranking

Top 10 Companies in the Atomic Energy Industry

The leading companies in the atomic energy industry, ranked on market impact, performance, momentum, innovation and brand popularity.

Updated November 11, 2026 · Next review December 11, 2026

Verdict

EDF stands out for nuclear generation operators because it is building EPR reactors in the UK, while Constellation Energy focuses on nuclear electricity generation since it operates the largest nuclear fleet in the United States.

Ranked by Overall score · How we score ↓

Editor's top 3 picks

Where to start, by need.

  1. #1 Overall · Leader in nuclear generation

    EDF

    FR

    Ranked #1 · 9.2 · Nuclear generation operators

    Why we picked it: EDF is building EPR reactors in the UK and reported €118.7 billion in 2024 sales, with €36.5 billion EBITDA.

  2. Leader in uranium enrichment and fuel services

    Urenco

    GB

    Ranked #3 · 9.1 · Uranium enrichment and fuel services

    Why we picked it: Urenco is one of the three major commercial uranium enrichment suppliers worldwide, with 11.7% revenue growth and a 20.6% operating margin.

  3. Leader in reactor construction and buildout

    China National Nuclear Corporation

    CN

    Ranked #4 · 9.1 · Reactor construction and buildout

    Why we picked it: CNNC is a major Chinese reactor builder, uranium producer, and domestic enrichment supplier across nuclear generation and construction.

Pick 1 is the #1 company overall. Picks 2 and 3 are the highest-ranked companies in the top 5 that add a new segment.

Full ranking

Sort by
Top 10 companies in the atomic energy industry, 2026 – Gitnux ranking
#CompanyOverall ↓Company snapshot
1

EDF

Nuclear generation operators · FR

9.2
2

Constellation Energy

Nuclear generation operators · US

9.1
3

Urenco

Uranium enrichment and fuel services · GB

9.1
4

China National Nuclear Corporation

Reactor construction and buildout · CN

9.1
5

GE Vernova

Boiling-water reactor technology · US

8.9
6

Nuclearelectrica

Nuclear electricity generation, Romania · RO

8.7
7

Korea Electric Power

Nuclear generation and power projects · KR

8.7
8

Southern Company

Nuclear electricity generation, United States · US

8.7
9

NAC Kazatomprom

Uranium mining and nuclear materials · KZ

8.7
10

Centrus Energy

Uranium enrichment and nuclear fuel · US

8.6

How we score

  • Impact (30%): scale and weight in the market (revenue, market share, employees, market position).
  • Performance (20%): recent revenue growth and operating margin; an analyst assessment where a company does not publish them.
  • Momentum (20%): growth trajectory and future potential.
  • Innovation (15%): R&D intensity and how technologically advanced the company is.

Popularity (brand search demand, 15%) counts toward Overall but is not published as a column. Overall leaves out what is not known.

Scale Scores are shown on a 7–10 scale with one decimal; bars start at 7.0.

Cadence Recalculated when new figures are published; next review December 11, 2026.

Independence. Rankings are editorially independent. Scores, ranks, picks and the verdict follow the method above; no company can pay to change them.

Cite this ranking

APA

Samuel Norberg. (2026, November 11). Top 10 companies in the atomic energy industry. In Atomic Energy Industry Statistics. Gitnux. https://gitnux.org/atomic-energy-industry-statistics/#top-companies

report visual · Comparison

Nuclear electricity production

USA leads with 782 billion kWh.

USA782 billion kWh
China (Mainland)417.5 billion kWh
France364.4 billion kWh
Russia202.1 billion kWh
Korea, S179.4 billion kWh
Japan84.9 billion kWh
source-verifiedworld-nuclear.org

04 Statistics

Technology & Innovation

AI and automation adoption is widespread but benefits may not be quantified: 60% of more than 60 U.S. nuclear AI deployments were active without quantified benefits in 2026.

AI in the atomic energy industry

  • 15% of nuclear-industry survey respondents reported using machine learning for less than one year, while 35% reported one to three years of use, in a 2025 sector survey.[1]
  • 16% of nuclear-industry survey respondents reported using natural-language processing or generative AI for less than one year in 2025.[1]
  • 60% of more than 60 identified U.S. nuclear AI deployments were in active use without benefits being effectively quantified in 2026, according to ScottMadden research.[2]
  • 13% of nuclear-industry survey respondents reported using AI-related hardware for less than one year in 2025.[1]

Digital Transformation in the utilities and renewable energy sector (sector benchmark)

  • 92% of energy companies planned digital technology investments, while 27% were retraining and reskilling existing employees, according to a 2024 survey.[3]
  • 100% of utilities globally had initiated digital transformation, while 20% had completed it, according to a global survey conducted in 2024.[4]
  • 84% of energy and utilities organizations were investing in digital modernization in 2026, while 20% had begun reorganizing engineering operations.[5]
  • 73% of power and utilities companies said their organizational culture impeded digital-technology adoption in a global survey conducted in late 2024.[3]

Technology Adoption in the utilities and renewable energy sector (sector benchmark)

  • 73% of power and utilities organizations were using artificial intelligence, generative AI or machine learning in 2024, based on a global industry survey.[3]
  • 79% of power and utilities organizations were using cyber-threat monitoring and intelligence platforms covering IT and operational technology in 2024.[3]
  • 62% of power and utilities organizations were using robotic process automation in 2024, according to a global survey of industry executives and employees.[3]
  • 78% of power and utilities organizations were using advanced analytics in 2024, according to EY’s global Future of Energy Survey.[3]

Cloud Computing in the utilities and renewable energy sector (sector benchmark)

  • 32% of power and utilities organizations using cloud computing planned improvements or new uses during the following five years in 2024.[3]
  • 41% of energy companies allowed any department head or IT manager to deploy new cloud infrastructure, software or applications in an Infosys study.[6]
  • 63% of power and utilities organizations were using cloud computing while developing improvements or new applications in 2024.[3]
  • 45% of energy companies used only the cloud capacity and functions they had committed to, according to an Infosys industry study published in 2024.[6]
  • 79% of power and utilities organizations were using cloud computing in 2024, according to a global EY survey.[3]

Big Data in the utilities and renewable energy sector (sector benchmark)

  • 41% of utilities said advanced-metering-infrastructure data was fully embedded and scalable across daily workflows in 2026.[7]
  • 86% of utilities used advanced-metering-infrastructure data enterprise-wide or in specific workflows in 2026, according to a global utility executive survey.[7]
  • 20% of electric utilities had already implemented big-data analytics, while 32% were implementing it, in a survey covering 10 countries.[8]
  • 25% of utilities reported extensive use of analytics for business intelligence and billing or revenue analysis in a survey of 190 organizations.[9]
  • 78% of power and utilities organizations were using advanced analytics in 2024, a sector-specific proxy for big-data adoption in EY’s global survey.[3]

Blockchain in the atomic energy industry

  • 1 proof-of-concept project tested distributed-ledger technology for nuclear-waste data management through a 2020–2021 collaboration involving Sellafield, RKVST and Digital Catapult in the United Kingdom.[10]
  • 1 UK nuclear licensee was reported in 2023 to be exploring blockchain for nuclear-material records and software-cybersecurity information exchange.[11]

IoT in the utilities and renewable energy sector (sector benchmark)

  • 75% of power and utilities organizations were using Internet of Things technologies in 2024, according to a global EY survey.[3]
  • 80% of power and utilities organizations surveyed were IoT adopters, and 75% had at least one project reaching the use stage.[12]
  • 34% of utilities respondents had deployed IoT projects for energy generation in 2024, the highest deployment category in Viasat’s survey.[13]
  • 33% of utilities respondents had deployed IoT projects for vehicle tracking in 2024, according to Viasat’s industry survey.[13]
  • 55% of utilities respondents had a formal IoT strategy in 2024, up from 48% in 2021, according to Viasat’s global sector survey.[13]

Innovation in the atomic energy industry

  • 1,650 priority patent families in advanced nuclear technologies were granted to China in 2024, compared with about 60 in 2010.[14]

05 Statistics

Data & Analytics

Nuclear operators lean on long-running data systems such as the IAEA Power Reactor Information System, while utilities report varying governance progress into 2026.

Business intelligence in the atomic energy industry

  • The IAEA reported that it was developing and applying AI tools to support Member States’ peaceful uses of nuclear material and technology in 2024.[15]
  • The IAEA held a 2024 technical meeting on safety and operational considerations for advanced digital technologies at research reactors.[15]
  • The IAEA used artificial-intelligence tools in 2024 to support routine business activities and improve the efficiency of programmatic work.[15]
  • The IAEA’s 2025 operating-experience publication integrates reactor operating data, outage information and design characteristics for plants operating in 2024.[16]

Data analytics in the atomic energy industry

  • The IAEA report presents six figures illustrating global nuclear operational statistics through 2024.[16]
  • The IAEA’s 2025 operating-experience report covered individual nuclear power reactors that were in operation during 2024.[16]
  • The IAEA Power Reactor Information System contains nuclear-plant performance data published in operating-experience reports since 1970.[16]
  • The IAEA reported total nuclear electricity production of 2,617.3 TWh in 2024, based on its reactor database.[16]

Data Quality in the utilities and renewable energy sector (sector benchmark)

  • Across water utilities, 19% of respondents rated asset characteristics information as very good in 2026.[17]
  • Across water utilities, 7% of respondents rated asset information in EAM or CMMS as very good in 2026.[17]
  • Across electric utilities surveyed, 69% reported user confidence in data accuracy, compared with 77% for completeness.[18]
  • Across electric utilities surveyed, 77% reported no erosion in data quality over time.[18]
  • Across water utilities, 10% of respondents rated asset condition and performance information as very good in 2026.[17]
  • Across water utilities, 8% of respondents rated asset O&M cost information as very good in 2026.[17]

Data Governance in the utilities and renewable energy sector (sector benchmark)

  • Across utilities surveyed, 50% estimated they were still three to five years away from enterprise-level data governance in 2020.[19]
  • Across utilities surveyed, 6% reported fully traceable data from original source to decision-making or business processes in 2020.[19]
  • Across utilities surveyed, 56% had some form of inventory covering data sources and data-quality, integration, and analytics tools in 2020.[19]
  • Across energy and utilities organizations, 65% reported that all or nearly all of their data was governed in 2026.[20]
  • Across utilities surveyed, 9% had fully implemented an enterprise-wide data-governance program in 2020.[19]
  • Across power and utility executives surveyed, 57% assessed data-governance maturity as developing or initial in 2021; none reported advanced practices.[3]

KPIs in the atomic energy industry

  • The global nuclear fleet’s average capacity factor increased from 82% in 2023 to 83% in 2024.[21]
  • More than 60% of operating nuclear reactors achieved capacity factors above 80% in 2024.[21]
  • The number of operable nuclear reactors increased by three during 2024, reaching 440 worldwide at year-end.[21]
  • Seven nuclear reactors completed construction and connected to the grid in 2024.[21]

06 Statistics

Strategy & Growth

Construction stays concentrated in Asia: China accounted for half of the 78 GW under construction at end-2025, supporting sustained capacity-factor performance.

Growth in the atomic energy industry

  • Global nuclear generation reached a record 2,701 TWh in 2025, 35 TWh above the 2024 level.[21]
  • Eleven reactors began construction in 2025, including nine in China and two in Russia.[21]
  • Projected global nuclear capacity is 1,467 GWe in 2050 in the World Nuclear Association’s 2026 outlook.[21]
  • Global nuclear capacity reached 398 GWe at the end of 2024, an increase of 6 GWe from 2023.[21]
  • China had 32 GWe of nuclear capacity under construction in the World Nuclear Association’s January 2026 review.[21]

Differentiation in the atomic energy industry

  • The global nuclear fleet achieved an average capacity factor of 83.7% in 2025.[21]
  • North American reactors achieved an average capacity factor of 90% in 2024, the highest among the regions reported.[21]
  • The 2024 grid-connected reactor construction times ranged from 61 months for China’s Zhangzhou 1 to 204 months for France’s Flamanville 3.[21]
  • The world’s operable fleet at the end of 2024 comprised 313 pressurized-water reactors, 60 boiling-water reactors and 46 pressurized-heavy-water reactors.[21]
  • China’s Changjiang SMR 1, listed as starting construction in 2026, has a gross capacity of 125 MWe.[21]

Mergers and acquisitions in the atomic energy industry

  • BWXT agreed to acquire Kinectrics, whose 2024 revenue was expected to be approximately US$300 million across commercial nuclear power services and nuclear medicine.[22]
  • Oklo acquired Creative Engineers in 2026 to add liquid-metal systems, component development, fabrication, manufacturing and applied nuclear R&D capabilities.[23]
  • Arlington Capital Partners acquired nuclear engineering firm ENERCON in 2026 and merged it with portfolio company Pond & Company.[24]
  • NANO Nuclear Energy closed its acquisition of patented Micro Modular Reactor and Pylon transportable-reactor technologies from Ultra Safe Nuclear Corporation in 2025.[25]

Strategic partnerships in the atomic energy industry

  • CEZ agreed in 2024 to acquire a 20% stake in Rolls-Royce SMR as part of a strategic partnership for small modular reactor deployment.[26]
  • NNSA strategic partnership projects generated $2 billion to $3 billion in annual reimbursements from outside entities during fiscal years 2019–2024.[27]
  • The United States and Singapore signed a strategic civil-nuclear cooperation memorandum in January 2025.[28]
  • NNSA strategic partnership projects operated through multiple national-security sites, including Pantex, Y-12, Los Alamos, Lawrence Livermore and Savannah River.[29]

07 Statistics

People & Workforce

Workforce expansion expectations remain large, with 375,000 workers projected for the U.S. nuclear-energy industry by 2050 versus approximately 100,000 currently employed.

Hiring in the atomic energy industry

  • 68,008 U.S. workers were employed in nuclear fuels and electric power generation in 2023, more than 1,800 above 2022.[28]
  • 8,768 people were hired by the UK civil and defence nuclear sector in 2024.[30]
  • 1.2 million jobs were in the global nuclear industry in 2024, a 6% increase from 2023.[31]
  • 96,000 people worked in the UK civil and defence nuclear sector in 2024, up 15% from 83,000 in 2023.[30]
  • China’s nuclear construction workforce grew by more than 20% in 2024 to approximately 76,000 workers.[31]

Remote Work in the utilities and renewable energy sector (sector benchmark)

  • Across U.S. utilities, 18.2% of employees worked fully remotely in November 2024.[32]
  • U.S. utilities employees worked 31.42% of paid days from home in 2024.[33]
  • Among U.S. utility employers recruiting new graduates, 9.3% of positions were fully remote in 2024.[34]
  • U.S. utilities employees worked 22.32% of paid days from home in 2026.[33]

Hybrid Work in the utilities and renewable energy sector (sector benchmark)

  • Across U.S. utilities, 51% of full-time employees worked either hybrid or fully from home during September–December 2024.[35]
  • Across U.S. utilities, 32.5% of employees worked in hybrid arrangements in November 2024.[32]
  • U.S. utilities had 28% of full-time employees in hybrid arrangements during September–December 2024.[35]
  • Among U.S. utility employers recruiting new graduates, 43.4% of positions were fully hybrid in 2024.[34]

Upskilling in the atomic energy industry

  • 375,000 workers are projected to be needed in the U.S. nuclear-energy industry by 2050, compared with approximately 100,000 currently employed, according to the Department of Energy.[28]
  • 120,000 workers are projected to be required by the UK nuclear sector in 2030, compared with 96,000 in 2024.[30]
  • $100 million was allocated in the U.S. fiscal-year 2024 spending bill for nuclear-reactor safety training and workforce development.[28]

Employee Engagement in the utilities and renewable energy sector (sector benchmark)

  • Among frontline energy and utilities workers, 57% said workplace communication tools were designed for desk workers rather than them in 2025.[36]
  • At Southern California Edison, 82% of employees gave a favorable overall engagement response in 2022.[37]
  • Among U.S. energy and utility organizations, 54% reported that frontline disengagement affected productivity in 2023.[38]
  • Across U.S. utilities, 70% of employees were engaged in the July 2025–June 2026 benchmark period.[39]

DEI in the atomic energy industry

  • 65% of U.S. nuclear electric-power-generation workers were male in 2023, compared with 73% across the overall U.S. energy workforce.[28]
  • 22% of the UK civil and defence nuclear workforce was female in 2024, while 70% was male.[30]
  • 34% of U.S. nuclear electric-power-generation workers were female in 2023, representing 19,696 employees.[28]
  • 21.4% of the UK nuclear workforce was female, with the industry targeting 40% by 2030.[40]

Change Management in the utilities and renewable energy sector (sector benchmark)

  • Only 15% of utility companies said they were leaders in actively listening to employees in 2020.[41]
  • Across utilities with active listening programs, 91% of employees said they could adapt to change, compared with 41% without such programs.[41]
  • Among utility organizations surveyed by Eaton, 51% were executing a digital-transformation strategy in 2023.[42]
  • Among utilities surveyed globally, 100% had initiated digital transformation and 20% had completed it in 2024.[43]
  • Among utilities surveyed globally, change management was cited as a digital-transformation barrier by 30% of respondents in 2024.[43]

08 Statistics

Marketing & Brand

Industry associations and supply-chain communities act as information hubs: the UK Nuclear Industry Association reported 330 member companies supported across the supply chain in 2026.

Social media in the atomic energy industry

  • 11,500 followers on X and more than 30,000 on LinkedIn were reported by the UK Nuclear Industry Association in 2026.[44]
  • 330 member companies were supported by the UK Nuclear Industry Association across the nuclear supply chain in 2026.[44]

Influencer Marketing in the utilities and renewable energy sector (sector benchmark)

  • Across B2B companies, 76% of marketing leaders believed creator collaborations build brand authenticity in 2025.[45]
  • Across B2B companies, 55% were using influencers in 2025, while another 29% planned to adopt influencer marketing within the following year.[45]
  • Across B2B companies, 28% of marketers ranked thought leaders or industry analysts as the most effective influencer type in 2025.[45]
  • Across B2B companies, authenticity and credibility were the top influencer-selection criteria for 58% of marketers in 2025.[45]
  • Across B2B companies, influencer marketing was associated with a 39-percentage-point advantage in brand-awareness goal attainment in 2025.[45]

09 Statistics

Operations & Execution

Operational performance remains high at fleet level: global average capacity factor was 83.7% in 2025, up from 82.9% in 2024.

Process optimization in the atomic energy industry

  • 7 reactors were connected to the grid in 2024, including 4 in China and 1 each in France, India and the United States.[21]
  • 64 months was the construction time highlighted for a first-of-a-kind reactor design in the global nuclear industry performance review.[21]
  • 11 reactors started construction in 2025, including 9 in China and 2 in Russia, indicating continued use of standardized nuclear construction programs.[21]
  • 62 months was the construction time for Zhangzhou 2 in China, compared with 163 months for Rajasthan 7 in India, for reactors connected to the grid in 2025.[21]

Operational efficiency in the atomic energy industry

  • 91.91% was the average capacity factor for China General Nuclear Power’s 28 operating nuclear units in 2024.[46]
  • 86.4% was the global median nuclear reactor load factor in 2024, while the top quartile averaged 93.7%.[16]
  • 83.7% was the global average nuclear reactor capacity factor in 2025, up from 82.9% in 2024.[21]
  • 299.5 TWh was EDF’s cumulative nuclear output in France through October 2026.[47]
  • 90% was the average capacity factor achieved by nuclear reactors in North America in 2024.[21]

Quality management in the atomic energy industry

  • 26.5 gCO2/kWh was EDF’s carbon intensity in 2025, following its nuclear-led generation portfolio.[47]
  • 410 reactors generated electricity in 2024, providing the operating population used for the World Nuclear Association’s global performance analysis.[21]
  • 95% of EDF’s electricity generation was low-carbon in 2025.[47]
  • 93.7% was the average load factor for the top 25% of nuclear reactors by performance in 2024.[16]

Supply chain in the atomic energy industry

  • 32% of U.S. uranium deliveries in 2025 came from Canada, followed by 28% from Kazakhstan and 15% from Australia.[48]
  • 71,006 tonnes of uranium oxide concentrate were supplied by mines in 2024, covering 90% of utilities’ annual requirements.[21]
  • 46.9 million pounds of U3O8 equivalent were purchased by U.S. civilian nuclear reactor owners for delivery in 2025.[48]
  • 200 tonnes per year was the design capacity reached by the Ust-Kamenogorsk fuel-fabrication plant at the end of 2024.[21]
  • 68,076 thousand SWU per year was the estimated global uranium-enrichment capacity for 2025.[21]

Outsourcing / Offshoring in the utilities and renewable energy sector (sector benchmark)

  • 55% of surveyed solar OEMs, technicians and installers across the United States, United Kingdom, Germany and Spain outsourced most solar maintenance in 2025.[49]
  • Approximately 45% of electric transmission, distribution and gas distribution work was outsourced in 2024, projected to exceed 50% over the following five years.[50]
  • 68.4% of U.S. utilities surveyed outsourced bill printing in 2026, based on responses from 95 utilities across 18 states.[51]
  • 40% of U.S. power and utilities executives surveyed said they would outsource some business functions to external contractors, according to a 2025 survey.[3]
  • 54% of U.S. solar companies surveyed outsourced most solar maintenance in 2025, compared with 60% in Germany and 48% in the United Kingdom.[49]

10 Statistics

Finance & Pricing

Balance-sheet and margin differences matter: EDF reported net financial debt of €51.5 billion at end-2025 with a net-debt-to-EBITDA ratio of 1.8x.

Pricing strategy in the atomic energy industry

  • 1.49x was EDF’s net-financial-debt-to-EBITDA ratio in 2024 amid lower market prices and stronger nuclear output.[47]
  • €118.7 billion was EDF’s 2024 sales, while lower market prices contributed to a 15.7% organic decline from 2023.[47]
  • €113.3 billion was EDF’s 2025 sales, with the company reporting a faster deployment of its commercial policy and long-term price visibility for customers.[47]

Cost reduction in the atomic energy industry

  • 70% of nuclear EPC costs were direct costs for physical equipment, labor and materials, according to the World Nuclear Association cost breakdown.[21]
  • 64 months was the construction period reported for a first-of-a-kind reactor design, illustrating a potential schedule-based cost advantage for standardized delivery.[21]
  • 80% of a nuclear plant’s overnight cost was attributed to engineering, procurement and construction costs in the World Nuclear Association cost breakdown.[21]

Profitability in the atomic energy industry

  • 12.5% was GE Vernova’s segment EBITDA margin in 2024 across its power businesses, including nuclear power revenue of $819 million.[52]
  • 3,087.7 billion Russian rubles was Rosatom’s 2024 revenue, up 20.1% from 2023.[53]
  • 10.72% was Rosatom’s return on sales in 2024, compared with 9.95% in 2023.[53]
  • €36.5 billion was EDF’s 2024 EBITDA, alongside €11.4 billion in net income attributable to the group.[47]

Financial planning in the atomic energy industry

  • €28.5 billion was EDF’s green financing issued by 2025, supporting its low-carbon generation and infrastructure investment program.[47]
  • €51.5 billion was EDF’s net financial debt at the end of 2025, with a net-debt-to-EBITDA ratio of 1.8x.[47]
  • €3.978 billion was EDF’s additional 2024 provision for the Cigeo spent-fuel storage facility following revised cost estimates.[47]
  • €54.3 billion was EDF’s net financial debt at the end of 2024, with a net-debt-to-EBITDA ratio of 1.49x.[47]
  • €805 million was EDF’s R&D budget in 2025, supporting investment planning for its nuclear-led low-carbon electricity strategy.[47]

11 Statistics

Product & Service

Large-scale new-build continues while SMR deployment remains limited; capacity under construction was 78 GW in 2025 with nearly all units above 1,000 MW.

Product development in the atomic energy industry

  • Two commercial small modular reactors were under construction in 2025: one 125 MW unit in China and one 300 MW unit in Russia.[54]
  • More than 120 SMR developers participated in the OECD Nuclear Energy Agency’s 2026 digital-dashboard update.[55]
  • 10 nuclear reactors with 12.2 GW of capacity began construction in 2025, including nine in China and one in Russia.[54]
  • 78 GW of nuclear reactor capacity was under construction in 15 countries in 2025, with half located in China.[54]

Product lifecycle in the atomic energy industry

  • More than 220 commercial, experimental or prototype reactors had been retired from operation by 2025.[21]
  • Four nuclear reactors permanently shut down in 2024: two in Canada, one in Russia and one in Taiwan.[21]
  • 440 nuclear reactors were operable worldwide at the end of 2024, with total capacity of 398 GWe.[21]
  • 213 nuclear power reactors were closed by mid-2024, representing more than 106 GW of permanently retired capacity.[56]

After-sales in the atomic energy industry

  • U.S. average nuclear generation costs fell to $33.74/MWh in 2024, down 38% from $54.10/MWh in 2012.[21]
  • The global nuclear fleet achieved an average capacity factor of 83% in 2024, reflecting continuing operational performance after commissioning.[21]
  • North American nuclear reactors achieved an average capacity factor of 90% in 2024.[21]
  • U.S. nuclear plants have achieved an average capacity factor above 90% since 2001.[21]

Value proposition in the atomic energy industry

  • Nuclear power supplied 9% of global electricity in 2024.[21]
  • 2,667 TWh of electricity was generated by nuclear reactors worldwide in 2024, the highest annual total on record.[21]
  • Nuclear reactors helped avoid 2.1 billion tonnes of carbon dioxide emissions compared with equivalent coal generation in 2024.[21]
  • About 15% of operating nuclear reactors provide district heating in addition to electricity generation.[21]

12 Statistics

Sustainability & Ethics

Nuclear’s climate positioning is supported by output-linked figures: nuclear avoided 2.1 billion tonnes of carbon dioxide versus coal generation in 2024.

Sustainability in the atomic energy industry

  • Nuclear reactors supplied 2,667 TWh of electricity in 2024 while accounting for about 9% of global electricity generation.[21]
  • Global nuclear generation increased by 66 TWh between 2023 and 2024, reaching a record 2,667 TWh.[21]
  • Nuclear power avoided 2.1 billion tonnes of carbon dioxide emissions compared with coal generation in 2024.[21]
  • Fourteen countries generated at least one-quarter of their electricity from nuclear power in 2024.[21]

ESG in the atomic energy industry

  • All 94 U.S. operating power-reactor licensees had demonstrated decommissioning funding assurance by February 2026.[21]
  • Approximately 99,000 tonnes of used nuclear fuel from U.S. power generation had accumulated by May 2026.[21]
  • A further $11.5 billion was held by U.S. licensees for reactors undergoing decommissioning at the end of 2024.[21]
  • U.S. operating-reactor decommissioning trust funds totaled about $84 billion at the end of 2024.[21]

Circular economy in the atomic energy industry

  • The U.S. had approximately 99,000 tonnes of used nuclear fuel from power generation by May 2026.[21]
  • About 43% of U.S. used nuclear fuel was in pool storage and 56% was in dry-cask storage in 2026.[21]

Carbon footprint in the atomic energy industry

  • Nuclear generation has avoided an estimated 97.2 billion tonnes of carbon dioxide compared with coal generation since 1970.[21]
  • Nuclear reactors supplied 2,667 TWh of electricity in 2024, the highest annual nuclear generation recorded.[21]
  • Nuclear reactors avoided 2.1 billion tonnes of carbon dioxide emissions relative to coal generation in 2024.[21]
  • Nuclear generation has avoided an estimated 43.6 billion tonnes of carbon dioxide compared with gas generation since 1970.[21]

14 Statistics

Globalization & Expansion

Geographic build pressures persist: China had 32 GWe of nuclear capacity under construction in the World Nuclear Association’s January 2026 review.

Globalization in the atomic energy industry

  • About 35 countries were considering, planning or starting nuclear power programmes in November 2026.[21]
  • 68 reactors were commissioned worldwide during 2015–2024, including 56 in Asian countries.[21]
  • 59 of the 70 reactors under construction worldwide were located in Asia in 2024.[21]
  • 440 nuclear reactors were operable worldwide at the end of 2024, spanning Africa, Asia, Europe and the Americas.[21]
  • About 80 power reactors were under construction in 15 countries in November 2026.[21]

Cultural adaptation in the atomic energy industry

  • The 2024 grid connections included reactors in China, France, India, the United Arab Emirates and the United States.[21]
  • Reactors under construction in 2024 included projects in 15 countries, from Argentina and Bangladesh to Turkey and the United Kingdom.[21]
  • The 2024 reactor construction starts included six units in China and one each in Egypt, Pakistan and Russia.[21]
  • Nuclear reactors were operating in 31 countries in 2025, requiring deployment across diverse national regulatory and operating environments.[21]

Supplier management in the atomic energy industry

  • Around 3,200 suppliers formed EDF Energy’s UK supply chain in 2024.[64]
  • EDF Energy spent £1.7 billion with 2,400 small and medium-sized enterprises in 2024, representing 68% of its supplier base.[64]
  • Uranium mines supplied 60,213 tonnes of uranium to the global nuclear fuel market in 2024, covering about 90% of annual reactor requirements.[21]
  • Canada supplied 32% of U.S. nuclear-utility uranium deliveries in 2025, followed by Kazakhstan at 28%.[48]
  • U.S. nuclear-plant owners purchased 46.9 million pounds of uranium equivalent from domestic and foreign suppliers in 2025.[48]

Stakeholder management in the atomic energy industry

  • The EDF Group served more than 40 million customers worldwide in 2024.[64]
  • The eight EDF nuclear stations in the United Kingdom supported approximately 31,000 jobs per year.[64]
  • The NRC planned a public meeting or other event for each U.S. nuclear plant to discuss 2024 annual assessment results.[57]
  • Approximately 23,000 EDF employees and 11,000 contractor employees worked at French nuclear sites in 2024.[65]

Distribution channels in the atomic energy industry

  • In 2025, nuclear reactors supplied about 9% of global electricity through national and regional power systems.[21]
  • About 15% of operating nuclear reactors provide district-heating services in addition to electricity generation.[21]
  • Seven reactors were connected to electricity grids worldwide in 2024: four in China and one each in France, India, the UAE and the United States.[21]
  • Nuclear reactors generated 2,667 TWh of electricity worldwide in 2024, distributing power primarily through national electricity grids.[21]

Key questions about the atomic energy industry

What was global nuclear generation and capacity in 2025?
Global nuclear generation reached 2,702 TWh in 2025. Global capacity was about 420 GW the same year, with an average capacity factor of 83.7%.
How fast could nuclear capacity grow toward 2050?
The World Nuclear Association projects global nuclear capacity could reach 1,457 GWe by 2050 versus about 420 GW at end-2025. That implies an approximate 5.1% compound annual growth rate from 2025 to 2050.
Which companies lead the atomic energy industry?
EDF stands out for nuclear generation operators because it is building EPR reactors in the UK, while Constellation Energy focuses on nuclear electricity generation since it operates the largest nuclear fleet in the United States.
What technology shifts are showing up in nuclear operations and digital use?
In 2025, 35% of survey respondents reported one to three years of machine learning use, and 16% reported natural-language processing or generative AI use for less than one year. In 2024, 62% of power and utilities organizations reported robotic process automation use.
How is the industry structured across reactor types and build pipelines?
The industry is segmented into large conventional reactors and small modular or advanced reactors. More than 70% of operable reactors are pressurized-water reactors, and nearly all reactors under construction are large-scale units above 1,000 MW.
Where do fuel supply constraints appear in the market outlook?
Fuel supply is a constraint because uranium mining, conversion, enrichment, and fabrication must expand substantially to support future capacity growth. The global estimate of uranium-enrichment capacity was 68,076 thousand SWU per year for 2025.
Reference

Cite This Report

This report is designed to be cited. We maintain stable URLs and versioned verification dates. Copy the format appropriate for your publication below.

APA
Samuel Norberg. (2026, November 11). Atomic Energy Industry Statistics. Gitnux. https://gitnux.org/atomic-energy-industry-statistics
MLA
Samuel Norberg. "Atomic Energy Industry Statistics." Gitnux, 11 Nov 2026, https://gitnux.org/atomic-energy-industry-statistics.
Chicago
Samuel Norberg. 2026. "Atomic Energy Industry Statistics." Gitnux. https://gitnux.org/atomic-energy-industry-statistics.